Construction scheduler's manual

Hutchings, Jonathan F.

McGraw-Hill · 1996

Deskripsi

The CPM Construction Scheduler's Manual by Jonathan F. Hutchings serves as a comprehensive guide for construction project schedulers, emphasizing the critical role of effective scheduling in ensuring project profitability and success. The manual delves into critical path management (CPM), construction and contract law, preconstruction planning, network scheduling and diagramming, project operations, OSHA inspections, risk management, scheduling contingencies, and software applications. Notably, it includes a lite version of the FastPro CPM Scheduler software, enabling users to create professional-quality schedules, reports, and related documents. The manual also offers insights into construction management methods, addressing topics such as fast-tracking, design-build approaches, dispute resolution, and project safety, providing schedulers with a well-rounded understanding of both scheduling techniques and broader construction management practices.

Subjek

No. panggil

REF 658.404 016 HUT c

Detail

Penerbit
McGraw-Hill
Tahun
1996
ISBN
0-07-912224-8
Kolasi
xx, 353 hal.; app.; ind.; 28 cm
Bahasa
English
Klasifikasi
658.404 016

© 2026 UPT Perpustakaan PolinemaStatus Layanan