[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"ssr-book-pusat-1932812459":3,"menu-footer-id":54,"menu-main-id":116},{"id":4,"branch":5,"biblio_id":6,"title":7,"authors":8,"subjects":12,"items":15,"branch_name":20,"publisher":42,"publish_place":23,"year":43,"edition":23,"isbn":44,"collation":45,"series":23,"language":46,"classification":47,"call_number":48,"gmd":23,"notes":49,"cover":23,"availability":50,"url":53},"opac-pusat-1932812459","pusat","1932812459","Manajemen proyek",[9,10,11],"Darmawan","Ulinnuha, Amirah","Ahmad, Kurniawan",[13,14],"MANAJEMEN PROYEK","PROJECT MANAGEMENT",[16,24,30,33,36,39],{"available":17,"item_code":18,"call_number":19,"location":20,"status":21,"state":22,"due_date":23},false,"2024100013-1","658.404 DAR m C\u002F1","Perpustakaan Pusat","Tersedia (Tidak Dipinjamkan)","reference",null,{"available":25,"item_code":26,"call_number":27,"location":20,"status":28,"state":29,"due_date":23},true,"2024100013-2","658.404 DAR m C\u002F2","Tersedia","available",{"available":25,"item_code":31,"call_number":32,"location":20,"status":28,"state":29,"due_date":23},"2024100013-3","658.404 DAR m C\u002F3",{"available":25,"item_code":34,"call_number":35,"location":20,"status":28,"state":29,"due_date":23},"2025100018-4","658.404 DAR m C\u002F4",{"available":25,"item_code":37,"call_number":38,"location":20,"status":28,"state":29,"due_date":23},"2025100018-5","658.404 DAR m C\u002F5",{"available":25,"item_code":40,"call_number":41,"location":20,"status":28,"state":29,"due_date":23},"2025100018-6","658.404 DAR m C\u002F6","Bumi Aksara",2024,"978-623-328-904-7","ix, 356 hal.; bibl.; 24 cm","Indonesia","658.404","658.404 DAR m","Manajemen proyek membantu setiap bagian bisnis berjalan lebih efisien dan efektif. Jika dilakukan dengan benar, manajemen proyek dapat membantu pimpinan untuk merencanakan dan mengelola proyek sehingga setiap tujuan dan hasil dapat diselesaikan tepat waktu dan sesuai anggaran. Buku ini terdiri atas 14 bab yang membahas berbagai aspek manajemen proyek secara komprehensif. Pembahasan dalam buku ini meliputi konsep manajemen proyek, studi kelayakan proyek, pemetaan proses proyek, manajemen organisasi, proses manajemen proyek, manajemen integrasi proyek, manajemen ruang lingkup proyek, manajemen waktu proyek, manajemen biaya proyek, manajemen kualitas proyek, mana- jemen sumber daya manusia proyek, manajemen risiko proyek, mana- jemen pengadaan proyek, dan laporan proyek.",{"items":51,"available":52},6,5,"https:\u002F\u002Fopac.polinema.ac.id\u002Findex.php?p=show_detail&id=1932812459",[55,78,95],[56,62,66,70,74],{"id":57,"parent":58,"target":59,"content":60,"title":60,"url":61},2500,"0","","Polinema Malang","https:\u002F\u002Fpolinema.ac.id\u002F",{"id":63,"parent":58,"target":59,"content":64,"title":64,"url":65},2536,"Bahasa","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-bahasa\u002F",{"id":67,"parent":58,"target":59,"content":68,"title":68,"url":69},2537,"Humas","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-humas\u002F",{"id":71,"parent":58,"target":59,"content":72,"title":72,"url":73},2538,"MKU","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-mku\u002F",{"id":75,"parent":58,"target":59,"content":76,"title":76,"url":77},2539,"Penelitian dan Pengabdian","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-p2m\u002F",[79,83,87,91],{"id":80,"parent":58,"target":59,"content":81,"title":81,"url":82},2771,"Percetakan","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-percetakan\u002F",{"id":84,"parent":58,"target":59,"content":85,"title":85,"url":86},2772,"Pemeliharaan dan Perawatan","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-pp\u002F",{"id":88,"parent":58,"target":59,"content":89,"title":89,"url":90},2773,"Pusat Komputer","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Fpuskom\u002F",{"id":92,"parent":58,"target":59,"content":93,"title":93,"url":94},2775,"Job Placement Center","http:\u002F\u002Fjpc.polinema.ac.id\u002F",[96,100,104,108,112],{"id":97,"parent":58,"target":59,"content":98,"title":98,"url":99},2501,"Admisi","http:\u002F\u002Fadmisi.polinema.ac.id\u002F",{"id":101,"parent":58,"target":59,"content":102,"title":102,"url":103},2570,"Alumni","http:\u002F\u002Falumni.polinema.ac.id\u002F",{"id":105,"parent":58,"target":59,"content":106,"title":106,"url":107},2571,"Beasiswa","http:\u002F\u002Fbeasiswa.polinema.ac.id\u002F",{"id":109,"parent":58,"target":59,"content":110,"title":110,"url":111},2572,"LPSE","http:\u002F\u002Flpse.polinema.ac.id\u002Feproc4",{"id":113,"parent":58,"target":59,"content":114,"title":114,"url":115},2574,"Simpeg","https:\u002F\u002Fsimpeg.polinema.ac.id\u002F",[117,176,194,216],{"id":118,"parent":58,"target":59,"content":119,"title":119,"url":120,"children":121,"dropdown":175},2534,"Layanan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002F",[122,127,131,135,139,143,147,151,155,159,163,167,171],{"id":123,"parent":124,"target":59,"content":125,"title":125,"url":126},2474,"2534","Koleksi Umum","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-umum\u002F",{"id":128,"parent":124,"target":59,"content":129,"title":129,"url":130},2493,"Sirkulasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fsirkulasi\u002F",{"id":132,"parent":124,"target":59,"content":133,"title":133,"url":134},2475,"Loker","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Floker\u002F",{"id":136,"parent":124,"target":59,"content":137,"title":137,"url":138},2492,"Referensi dan Karya Ilmiah","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-referensi-dan-laporan-akhir\u002F",{"id":140,"parent":124,"target":59,"content":141,"title":141,"url":142},3792,"Layanan Penelusuran Informasi Secara Online","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-penelusuran-informasi-secara-online\u002F",{"id":144,"parent":124,"target":59,"content":145,"title":145,"url":146},4460,"Layanan Keanggotaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-keanggotaan-2\u002F",{"id":148,"parent":124,"target":59,"content":149,"title":149,"url":150},3745,"Baca Ditempat","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-baca-ditempat\u002F",{"id":152,"parent":124,"target":59,"content":153,"title":153,"url":154},2473,"Koleksi Tandon","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-tandon\u002F",{"id":156,"parent":124,"target":59,"content":157,"title":157,"url":158},3823,"Jasa Silang Layan Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fjasa-silang-layan-perpustakaan\u002F",{"id":160,"parent":124,"target":59,"content":161,"title":161,"url":162},3832,"Layanan Multimedia","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-multimedia\u002F",{"id":164,"parent":124,"target":59,"content":165,"title":165,"url":166},3834,"Layanan Literasi Informasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-literasi-informasi\u002F",{"id":168,"parent":124,"target":59,"content":169,"title":169,"url":170},3835,"Layanan Penyedia Dokumen","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-penyedia-dokumen\u002F",{"id":172,"parent":124,"target":59,"content":173,"title":173,"url":174},2489,"Administrasi Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fadministrasi-perpustakaan\u002F","layanan",{"id":177,"parent":58,"target":59,"content":178,"title":178,"url":179,"children":180,"dropdown":193},2838,"e-Resources","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fe-book\u002F",[181,185,189],{"id":182,"parent":183,"target":59,"content":184,"title":184,"url":179},2577,"2838","e-Book",{"id":186,"parent":183,"target":59,"content":187,"title":187,"url":188},2578,"e-Journal","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fe-journal\u002F",{"id":190,"parent":183,"target":59,"content":191,"title":191,"url":192},90001,"Open Access","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fopen-access\u002F","e-resources",{"id":195,"parent":58,"target":59,"content":196,"title":196,"url":197,"children":198,"dropdown":215},2837,"Informasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fpengumuman\u002F",[199,204,207,211],{"id":200,"parent":201,"target":59,"content":202,"title":202,"url":203},2491,"2837","Jam Layanan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fjam-layanan\u002F",{"id":205,"parent":201,"target":59,"content":206,"title":206,"url":197},2766,"Pengumuman",{"id":208,"parent":201,"target":59,"content":209,"title":209,"url":210},2514,"Berita","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fberita\u002F",{"id":212,"parent":201,"target":59,"content":213,"title":213,"url":214},2515,"Artikel","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fartikel\u002F","informasi",{"id":217,"parent":58,"target":59,"content":218,"title":218,"url":219,"children":220,"dropdown":250},2482,"Profil","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002F",[221,226,230,234,238,242,246],{"id":222,"parent":223,"target":59,"content":224,"title":224,"url":225},2483,"2482","Sejarah","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fsejarah\u002F",{"id":227,"parent":223,"target":59,"content":228,"title":228,"url":229},2487,"Visi, Misi dan Tujuan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fvisi-misi-dan-tujuan\u002F",{"id":231,"parent":223,"target":59,"content":232,"title":232,"url":233},2484,"Staf Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstaf-perpustakaan\u002F",{"id":235,"parent":223,"target":59,"content":236,"title":236,"url":237},2485,"Struktur Organisasi Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstruktur-organisasi-perpustakaan\u002F",{"id":239,"parent":223,"target":59,"content":240,"title":240,"url":241},2486,"Tata Tertib","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Ftata-tertib\u002F",{"id":243,"parent":223,"target":59,"content":244,"title":244,"url":245},3705,"Statistik","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstatistik\u002F",{"id":247,"parent":223,"target":59,"content":248,"title":248,"url":249},4990,"Standard Operating Procedure (SOP)","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstandard-operating-procedure-sop-2\u002F","profil"]