[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"ssr-book-pusat-5571":3,"menu-footer-id":47,"menu-main-id":109},{"id":4,"branch":5,"biblio_id":6,"title":7,"authors":8,"subjects":10,"items":13,"branch_name":18,"publisher":33,"publish_place":21,"year":34,"edition":35,"isbn":36,"collation":37,"series":21,"language":38,"classification":39,"call_number":40,"gmd":21,"notes":41,"cover":42,"availability":43,"url":46},"opac-pusat-5571","pusat","5571","Manajemen proyek: konsep dan implementasi",[9],"Santosa, Budi",[11,12],"MANAJEMEN PROYEK","PROJECT MANAGEMENT",[14,22,28],{"available":15,"item_code":16,"call_number":17,"location":18,"status":19,"state":20,"due_date":21},false,"2020906190-1","658.404 SAN m C\u002F1","Perpustakaan Pusat","Tersedia (Tidak Dipinjamkan)","reference",null,{"available":23,"item_code":24,"call_number":25,"location":18,"status":26,"state":27,"due_date":21},true,"2020906190-2","658.404 SAN m C\u002F2","Tersedia","available",{"available":15,"item_code":29,"call_number":30,"location":18,"status":31,"state":32,"due_date":21},"2020906190-3","658.404 SAN m C\u002F3","Diperbaiki","repair","Graha Ilmu",2009,"1","978-979-756-441-4","xiv, 252 hal.; bibl.; ind.; ill.; 29 cm","Indonesia","658.404","658.404 SAN m","Materi pembahasan meliputi: konsep dan pengertian siklus hidup proyek organisasi proyek ilmu proyek perencanaan proyek penjadwalan royek minimasi biaya dan alokasi sumberdaya esimasi biaya dan penganggaran pengendalian royek evaluasi, pelaporan dan penyelesaian proyaek pemilihan proyek mengelola konflik dalm proyek manajemen resiko proyek criical chain roec mangemen.","https:\u002F\u002Fopac.polinema.ac.id\u002Fimages\u002Fdocs\u002Fmanajemen_proyek_budi_santosa.jpg.jpg",{"items":44,"available":45},3,1,"https:\u002F\u002Fopac.polinema.ac.id\u002Findex.php?p=show_detail&id=5571",[48,71,88],[49,55,59,63,67],{"id":50,"parent":51,"target":52,"content":53,"title":53,"url":54},2500,"0","","Polinema Malang","https:\u002F\u002Fpolinema.ac.id\u002F",{"id":56,"parent":51,"target":52,"content":57,"title":57,"url":58},2536,"Bahasa","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-bahasa\u002F",{"id":60,"parent":51,"target":52,"content":61,"title":61,"url":62},2537,"Humas","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-humas\u002F",{"id":64,"parent":51,"target":52,"content":65,"title":65,"url":66},2538,"MKU","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-mku\u002F",{"id":68,"parent":51,"target":52,"content":69,"title":69,"url":70},2539,"Penelitian dan Pengabdian","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-p2m\u002F",[72,76,80,84],{"id":73,"parent":51,"target":52,"content":74,"title":74,"url":75},2771,"Percetakan","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-percetakan\u002F",{"id":77,"parent":51,"target":52,"content":78,"title":78,"url":79},2772,"Pemeliharaan dan Perawatan","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-pp\u002F",{"id":81,"parent":51,"target":52,"content":82,"title":82,"url":83},2773,"Pusat Komputer","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Fpuskom\u002F",{"id":85,"parent":51,"target":52,"content":86,"title":86,"url":87},2775,"Job Placement Center","http:\u002F\u002Fjpc.polinema.ac.id\u002F",[89,93,97,101,105],{"id":90,"parent":51,"target":52,"content":91,"title":91,"url":92},2501,"Admisi","http:\u002F\u002Fadmisi.polinema.ac.id\u002F",{"id":94,"parent":51,"target":52,"content":95,"title":95,"url":96},2570,"Alumni","http:\u002F\u002Falumni.polinema.ac.id\u002F",{"id":98,"parent":51,"target":52,"content":99,"title":99,"url":100},2571,"Beasiswa","http:\u002F\u002Fbeasiswa.polinema.ac.id\u002F",{"id":102,"parent":51,"target":52,"content":103,"title":103,"url":104},2572,"LPSE","http:\u002F\u002Flpse.polinema.ac.id\u002Feproc4",{"id":106,"parent":51,"target":52,"content":107,"title":107,"url":108},2574,"Simpeg","https:\u002F\u002Fsimpeg.polinema.ac.id\u002F",[110,169,187,209],{"id":111,"parent":51,"target":52,"content":112,"title":112,"url":113,"children":114,"dropdown":168},2534,"Layanan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002F",[115,120,124,128,132,136,140,144,148,152,156,160,164],{"id":116,"parent":117,"target":52,"content":118,"title":118,"url":119},2474,"2534","Koleksi Umum","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-umum\u002F",{"id":121,"parent":117,"target":52,"content":122,"title":122,"url":123},2493,"Sirkulasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fsirkulasi\u002F",{"id":125,"parent":117,"target":52,"content":126,"title":126,"url":127},2475,"Loker","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Floker\u002F",{"id":129,"parent":117,"target":52,"content":130,"title":130,"url":131},2492,"Referensi dan Karya Ilmiah","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-referensi-dan-laporan-akhir\u002F",{"id":133,"parent":117,"target":52,"content":134,"title":134,"url":135},3792,"Layanan Penelusuran Informasi Secara Online","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-penelusuran-informasi-secara-online\u002F",{"id":137,"parent":117,"target":52,"content":138,"title":138,"url":139},4460,"Layanan Keanggotaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-keanggotaan-2\u002F",{"id":141,"parent":117,"target":52,"content":142,"title":142,"url":143},3745,"Baca Ditempat","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-baca-ditempat\u002F",{"id":145,"parent":117,"target":52,"content":146,"title":146,"url":147},2473,"Koleksi Tandon","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-tandon\u002F",{"id":149,"parent":117,"target":52,"content":150,"title":150,"url":151},3823,"Jasa Silang Layan Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fjasa-silang-layan-perpustakaan\u002F",{"id":153,"parent":117,"target":52,"content":154,"title":154,"url":155},3832,"Layanan Multimedia","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-multimedia\u002F",{"id":157,"parent":117,"target":52,"content":158,"title":158,"url":159},3834,"Layanan Literasi Informasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-literasi-informasi\u002F",{"id":161,"parent":117,"target":52,"content":162,"title":162,"url":163},3835,"Layanan Penyedia Dokumen","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-penyedia-dokumen\u002F",{"id":165,"parent":117,"target":52,"content":166,"title":166,"url":167},2489,"Administrasi Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fadministrasi-perpustakaan\u002F","layanan",{"id":170,"parent":51,"target":52,"content":171,"title":171,"url":172,"children":173,"dropdown":186},2838,"e-Resources","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fe-book\u002F",[174,178,182],{"id":175,"parent":176,"target":52,"content":177,"title":177,"url":172},2577,"2838","e-Book",{"id":179,"parent":176,"target":52,"content":180,"title":180,"url":181},2578,"e-Journal","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fe-journal\u002F",{"id":183,"parent":176,"target":52,"content":184,"title":184,"url":185},90001,"Open Access","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fopen-access\u002F","e-resources",{"id":188,"parent":51,"target":52,"content":189,"title":189,"url":190,"children":191,"dropdown":208},2837,"Informasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fpengumuman\u002F",[192,197,200,204],{"id":193,"parent":194,"target":52,"content":195,"title":195,"url":196},2491,"2837","Jam Layanan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fjam-layanan\u002F",{"id":198,"parent":194,"target":52,"content":199,"title":199,"url":190},2766,"Pengumuman",{"id":201,"parent":194,"target":52,"content":202,"title":202,"url":203},2514,"Berita","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fberita\u002F",{"id":205,"parent":194,"target":52,"content":206,"title":206,"url":207},2515,"Artikel","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fartikel\u002F","informasi",{"id":210,"parent":51,"target":52,"content":211,"title":211,"url":212,"children":213,"dropdown":243},2482,"Profil","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002F",[214,219,223,227,231,235,239],{"id":215,"parent":216,"target":52,"content":217,"title":217,"url":218},2483,"2482","Sejarah","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fsejarah\u002F",{"id":220,"parent":216,"target":52,"content":221,"title":221,"url":222},2487,"Visi, Misi dan Tujuan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fvisi-misi-dan-tujuan\u002F",{"id":224,"parent":216,"target":52,"content":225,"title":225,"url":226},2484,"Staf Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstaf-perpustakaan\u002F",{"id":228,"parent":216,"target":52,"content":229,"title":229,"url":230},2485,"Struktur Organisasi Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstruktur-organisasi-perpustakaan\u002F",{"id":232,"parent":216,"target":52,"content":233,"title":233,"url":234},2486,"Tata Tertib","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Ftata-tertib\u002F",{"id":236,"parent":216,"target":52,"content":237,"title":237,"url":238},3705,"Statistik","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstatistik\u002F",{"id":240,"parent":216,"target":52,"content":241,"title":241,"url":242},4990,"Standard Operating Procedure (SOP)","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstandard-operating-procedure-sop-2\u002F","profil"]