[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"ssr-repo-dspace000002873":3,"ssr-repo-divisions":66,"menu-footer-id":252,"menu-main-id":313},{"id":4,"title":5,"authors":6,"files":8,"advisors":35,"authors_detail":36,"advisors_detail":40,"publisher":41,"publish_place":42,"language":43,"type":44,"type_slug":45,"year":46,"department":47,"study_program":48,"keywords":49,"keywords_detail":54,"abstract":63,"abstract_html":64,"url":65},"repo-dspace000002873","Earned Value Analysis Method for Evaluation Time and Cost on The UIN-Malang Campus III Project",[7],"Fransiscus Xaverius Juan Even",[9,13,16,19,23,26,29,32],{"chapter":10,"requires_login":11,"label":12,"available":11},"abstrak",false,"Abstrak",{"chapter":14,"requires_login":11,"label":15,"available":11},"bab1","Bab I",{"chapter":17,"requires_login":11,"label":18,"available":11},"bab2","Bab II",{"chapter":20,"requires_login":21,"label":22,"available":11},"bab3",true,"Bab III",{"chapter":24,"requires_login":21,"label":25,"available":11},"bab4","Bab IV",{"chapter":27,"requires_login":21,"label":28,"available":11},"bab5","Bab V",{"chapter":30,"requires_login":21,"label":31,"available":11},"full","Dokumen Lengkap",{"chapter":33,"requires_login":11,"label":34,"available":21},"open","Akses Terbuka",[],[37],{"name":7,"nim":38,"slug":39},"2141320081","fransiscus-xaverius-juan-even",[],"Politeknik Negeri Malang","Malang","Inggris","Skripsi (D4)","skripsi-d4",2025,"D-IV MANAJEMEN REKAYASA KONSTRUKSI",null,[50,51,52,53],"Earned Value Analysis","Time Management","Cost Management","Evaluation",[55,57,59,61],{"name":50,"slug":56},"earned-value-analysis",{"name":51,"slug":58},"time-management",{"name":52,"slug":60},"cost-management",{"name":53,"slug":62},"evaluation","The implementation of the Lecture Building Construction Project, particularly UIN- Maulana Malik Ibrahim Malang Campus III, is a fairly complex and large project in terms of time and cost. Of course, in project implementation, the factors of planning and controlling time and cost are key to the success of the project. Therefore, this study aims to evaluate time and cost using the EVA method. In this context, EVA is employed as a method considered sufficiently effective and efficient in analyzing time and cost evaluations for project completion. The findings of this study reveal that the project contract value amounts to IDR 638,553,623,000, with an SPI value of 0.738 at week 84, while the CPI value at week 84 is 0.932. In terms of time, there was a deviation from the specified standard of 2 years and 6 months of implementation. From these two aspects, it can be concluded that the time and cost set at the beginning refer to delays in implementation and cost overruns in this project, so the existing implementation method must be changed, especially project performance and cost payments, which must be made on time and in accordance with the plan.","\u003Cp>The implementation of the Lecture Building Construction Project, particularly UIN- Maulana Malik Ibrahim Malang Campus III, is a fairly complex and large project in terms of time and cost. Of course, in project implementation, the factors of planning and controlling time and cost are key to the success of the project. Therefore, this study aims to evaluate time and cost using the EVA method. In this context, EVA is employed as a method considered sufficiently effective and efficient in analyzing time and cost evaluations for project completion. The findings of this study reveal that the project contract value amounts to IDR 638,553,623,000, with an SPI value of 0.738 at week 84, while the CPI value at week 84 is 0.932. In terms of time, there was a deviation from the specified standard of 2 years and 6 months of implementation. From these two aspects, it can be concluded that the time and cost set at the beginning refer to delays in implementation and cost overruns in this project, so the existing implementation method must be changed, especially project performance and cost payments, which must be made on time and in accordance with the plan.\u003C\u002Fp>","https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=dspace000002873&year=2025&title=earned-value-analysis-method-for-evaluation-time-and-cost-on-the-uin-malang-campus-iii-project",[67,103,130,163,177,202,227,245],{"id":68,"name":69,"slug":70,"count":71,"prodi":72},"MsJu1506001","Administrasi Niaga","administrasi-niaga",3696,[73,78,82,87,91,95,99],{"name":74,"slug":75,"level":76,"count":77},"D-III ADMINISTRASI BISNIS","d-iii-administrasi-bisnis","D-III",1702,{"name":79,"slug":80,"level":76,"count":81},"D-III BAHASA INGGRIS","d-iii-bahasa-inggris",217,{"name":83,"slug":84,"level":85,"count":86},"D-IV BAHASA INGGRIS UNTUK INDUSTRI PARIWISATA","d-iv-bahasa-inggris-untuk-industri-pariwisata","D-IV",24,{"name":88,"slug":89,"level":85,"count":90},"D-IV BAHASA INGGRIS UNTUK KOMUNIKASI BISNIS DAN PROFESIONAL","d-iv-bahasa-inggris-untuk-komunikasi-bisnis-dan-profesional",103,{"name":92,"slug":93,"level":85,"count":94},"D-IV MANAJEMEN PEMASARAN","d-iv-manajemen-pemasaran",1624,{"name":96,"slug":97,"level":85,"count":98},"D-IV PENGELOLAAN ARSIP DAN REKAMAN INFORMASI","d-iv-pengelolaan-arsip-dan-rekaman-informasi",25,{"name":100,"slug":101,"level":48,"count":102},"JURUSAN ADMINISTRASI NIAGA","jurusan-administrasi-niaga",1,{"id":104,"name":105,"slug":106,"count":107,"prodi":108},"MsJu1506002","Akuntansi","akuntansi",3545,[109,113,117,121,125],{"name":110,"slug":111,"level":76,"count":112},"D-III AKUNTANSI","d-iii-akuntansi",1262,{"name":114,"slug":115,"level":85,"count":116},"D-IV AKUNTANSI MANAJEMEN","d-iv-akuntansi-manajemen",1954,{"name":118,"slug":119,"level":85,"count":120},"D-IV KEUANGAN","d-iv-keuangan",315,{"name":122,"slug":123,"level":48,"count":124},"JURUSAN AKUNTANSI","jurusan-akuntansi",11,{"name":126,"slug":127,"level":128,"count":129},"S2 SISTEM INFORMASI AKUNTANSI","s2-sistem-informasi-akuntansi","S2",3,{"id":131,"name":132,"slug":133,"count":134,"prodi":135},"MsJu1506003","Teknik Elektro","teknik-elektro",4394,[136,140,144,148,152,156,160],{"name":137,"slug":138,"level":76,"count":139},"D-III TEKNIK ELEKTRONIKA","d-iii-teknik-elektronika",588,{"name":141,"slug":142,"level":76,"count":143},"D-III TEKNIK LISTRIK","d-iii-teknik-listrik",533,{"name":145,"slug":146,"level":76,"count":147},"D-III TEKNIK TELEKOMUNIKASI","d-iii-teknik-telekomunikasi",534,{"name":149,"slug":150,"level":85,"count":151},"D-IV JARINGAN TELEKOMUNIKASI DIGITAL","d-iv-jaringan-telekomunikasi-digital",998,{"name":153,"slug":154,"level":85,"count":155},"D-IV SISTEM KELISTRIKAN","d-iv-sistem-kelistrikan",849,{"name":157,"slug":158,"level":85,"count":159},"D-IV TEKNIK ELEKTRONIKA","d-iv-teknik-elektronika",867,{"name":161,"slug":162,"level":128,"count":98},"S2 TEKNIK ELEKTRO","s2-teknik-elektro",{"id":164,"name":165,"slug":166,"count":167,"prodi":168},"MsJu1506004","Teknik Kimia","teknik-kimia",1039,[169,173],{"name":170,"slug":171,"level":76,"count":172},"D-III TEKNIK KIMIA","d-iii-teknik-kimia",507,{"name":174,"slug":175,"level":85,"count":176},"D-IV TEKNOLOGI KIMIA INDUSTRI","d-iv-teknologi-kimia-industri",532,{"id":178,"name":179,"slug":180,"count":181,"prodi":182},"MsJu1506005","Teknik Mesin","teknik-mesin",3198,[183,187,191,195,199],{"name":184,"slug":185,"level":76,"count":186},"D-III TEKNIK MESIN","d-iii-teknik-mesin",1875,{"name":188,"slug":189,"level":76,"count":190},"D-III TEKNOLOGI PEMELIHARAAN PESAWAT UDARA","d-iii-teknologi-pemeliharaan-pesawat-udara",82,{"name":192,"slug":193,"level":85,"count":194},"D-IV TEKNIK MESIN PRODUKSI dan PERAWATAN","d-iv-teknik-mesin-produksi-dan-perawatan",649,{"name":196,"slug":197,"level":85,"count":198},"D-IV TEKNIK OTOMOTIF ELEKTRONIK","d-iv-teknik-otomotif-elektronik",591,{"name":200,"slug":201,"level":128,"count":102},"S2 MAGISTER TERAPAN REKAYASA TEKNOLOGI MANUFAKTUR","s2-magister-terapan-rekayasa-teknologi-manufaktur",{"id":203,"name":204,"slug":205,"count":206,"prodi":207},"MsJu1506006","Teknik Sipil","teknik-sipil",2775,[208,212,216,220,223],{"name":209,"slug":210,"level":76,"count":211},"D-III TEKNIK SIPIL","d-iii-teknik-sipil",992,{"name":213,"slug":214,"level":76,"count":215},"D-III TEKNOLOGI KONSTRUKSI JALAN, JEMBATAN, dan BANGUNAN AIR","d-iii-teknologi-konstruksi-jalan-jembatan-dan-bangunan-air",179,{"name":217,"slug":218,"level":76,"count":219},"D-III TEKNOLOGI PERTAMBANGAN","d-iii-teknologi-pertambangan",91,{"name":47,"slug":221,"level":85,"count":222},"d-iv-manajemen-rekayasa-konstruksi",1434,{"name":224,"slug":225,"level":85,"count":226},"D-IV TEKNOLOGI REKAYASA KONSTRUKSI JALAN DAN JEMBATAN","d-iv-teknologi-rekayasa-konstruksi-jalan-dan-jembatan",79,{"id":228,"name":229,"slug":230,"count":231,"prodi":232},"MsJu1506007","Teknologi Informasi","teknologi-informasi",2300,[233,237,241],{"name":234,"slug":235,"level":76,"count":236},"D-III MANAJEMEN INFORMATIKA","d-iii-manajemen-informatika",694,{"name":238,"slug":239,"level":85,"count":240},"D-IV SISTEM INFORMASI BISNIS","d-iv-sistem-informasi-bisnis",208,{"name":242,"slug":243,"level":85,"count":244},"D-IV TEKNIK INFORMATIKA","d-iv-teknik-informatika",1398,{"id":48,"name":246,"slug":247,"count":248,"prodi":249},"Tanpa prodi","tanpa-prodi",258,[250],{"name":41,"slug":251,"level":48,"count":248},"politeknik-negeri-malang",[253,276,292],[254,260,264,268,272],{"id":255,"parent":256,"target":257,"content":258,"title":258,"url":259},2500,"0","","Polinema Malang","https:\u002F\u002Fpolinema.ac.id\u002F",{"id":261,"parent":256,"target":257,"content":262,"title":262,"url":263},2536,"Bahasa","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-bahasa\u002F",{"id":265,"parent":256,"target":257,"content":266,"title":266,"url":267},2537,"Humas","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-humas\u002F",{"id":269,"parent":256,"target":257,"content":270,"title":270,"url":271},2538,"MKU","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-mku\u002F",{"id":273,"parent":256,"target":257,"content":274,"title":274,"url":275},2539,"Penelitian dan Pengabdian","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-p2m\u002F",[277,281,285,289],{"id":278,"parent":256,"target":257,"content":279,"title":279,"url":280},2771,"Percetakan","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-percetakan\u002F",{"id":282,"parent":256,"target":257,"content":283,"title":283,"url":284},2772,"Pemeliharaan dan Perawatan","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-pp\u002F",{"id":286,"parent":256,"target":257,"content":287,"title":287,"url":288},2773,"Pusat Komputer","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Fpuskom\u002F",{"id":206,"parent":256,"target":257,"content":290,"title":290,"url":291},"Job Placement Center","http:\u002F\u002Fjpc.polinema.ac.id\u002F",[293,297,301,305,309],{"id":294,"parent":256,"target":257,"content":295,"title":295,"url":296},2501,"Admisi","http:\u002F\u002Fadmisi.polinema.ac.id\u002F",{"id":298,"parent":256,"target":257,"content":299,"title":299,"url":300},2570,"Alumni","http:\u002F\u002Falumni.polinema.ac.id\u002F",{"id":302,"parent":256,"target":257,"content":303,"title":303,"url":304},2571,"Beasiswa","http:\u002F\u002Fbeasiswa.polinema.ac.id\u002F",{"id":306,"parent":256,"target":257,"content":307,"title":307,"url":308},2572,"LPSE","http:\u002F\u002Flpse.polinema.ac.id\u002Feproc4",{"id":310,"parent":256,"target":257,"content":311,"title":311,"url":312},2574,"Simpeg","https:\u002F\u002Fsimpeg.polinema.ac.id\u002F",[314,373,391,413],{"id":315,"parent":256,"target":257,"content":316,"title":316,"url":317,"children":318,"dropdown":372},2534,"Layanan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002F",[319,324,328,332,336,340,344,348,352,356,360,364,368],{"id":320,"parent":321,"target":257,"content":322,"title":322,"url":323},2474,"2534","Koleksi Umum","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-umum\u002F",{"id":325,"parent":321,"target":257,"content":326,"title":326,"url":327},2493,"Sirkulasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fsirkulasi\u002F",{"id":329,"parent":321,"target":257,"content":330,"title":330,"url":331},2475,"Loker","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Floker\u002F",{"id":333,"parent":321,"target":257,"content":334,"title":334,"url":335},2492,"Referensi dan Karya Ilmiah","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-referensi-dan-laporan-akhir\u002F",{"id":337,"parent":321,"target":257,"content":338,"title":338,"url":339},3792,"Layanan Penelusuran Informasi Secara Online","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-penelusuran-informasi-secara-online\u002F",{"id":341,"parent":321,"target":257,"content":342,"title":342,"url":343},4460,"Layanan Keanggotaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-keanggotaan-2\u002F",{"id":345,"parent":321,"target":257,"content":346,"title":346,"url":347},3745,"Baca Ditempat","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-baca-ditempat\u002F",{"id":349,"parent":321,"target":257,"content":350,"title":350,"url":351},2473,"Koleksi Tandon","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-tandon\u002F",{"id":353,"parent":321,"target":257,"content":354,"title":354,"url":355},3823,"Jasa Silang Layan Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fjasa-silang-layan-perpustakaan\u002F",{"id":357,"parent":321,"target":257,"content":358,"title":358,"url":359},3832,"Layanan Multimedia","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-multimedia\u002F",{"id":361,"parent":321,"target":257,"content":362,"title":362,"url":363},3834,"Layanan Literasi Informasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-literasi-informasi\u002F",{"id":365,"parent":321,"target":257,"content":366,"title":366,"url":367},3835,"Layanan Penyedia Dokumen","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-penyedia-dokumen\u002F",{"id":369,"parent":321,"target":257,"content":370,"title":370,"url":371},2489,"Administrasi Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fadministrasi-perpustakaan\u002F","layanan",{"id":374,"parent":256,"target":257,"content":375,"title":375,"url":376,"children":377,"dropdown":390},2838,"e-Resources","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fe-book\u002F",[378,382,386],{"id":379,"parent":380,"target":257,"content":381,"title":381,"url":376},2577,"2838","e-Book",{"id":383,"parent":380,"target":257,"content":384,"title":384,"url":385},2578,"e-Journal","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fe-journal\u002F",{"id":387,"parent":380,"target":257,"content":388,"title":388,"url":389},90001,"Open Access","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fopen-access\u002F","e-resources",{"id":392,"parent":256,"target":257,"content":393,"title":393,"url":394,"children":395,"dropdown":412},2837,"Informasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fpengumuman\u002F",[396,401,404,408],{"id":397,"parent":398,"target":257,"content":399,"title":399,"url":400},2491,"2837","Jam Layanan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fjam-layanan\u002F",{"id":402,"parent":398,"target":257,"content":403,"title":403,"url":394},2766,"Pengumuman",{"id":405,"parent":398,"target":257,"content":406,"title":406,"url":407},2514,"Berita","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fberita\u002F",{"id":409,"parent":398,"target":257,"content":410,"title":410,"url":411},2515,"Artikel","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fartikel\u002F","informasi",{"id":414,"parent":256,"target":257,"content":415,"title":415,"url":416,"children":417,"dropdown":447},2482,"Profil","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002F",[418,423,427,431,435,439,443],{"id":419,"parent":420,"target":257,"content":421,"title":421,"url":422},2483,"2482","Sejarah","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fsejarah\u002F",{"id":424,"parent":420,"target":257,"content":425,"title":425,"url":426},2487,"Visi, Misi dan Tujuan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fvisi-misi-dan-tujuan\u002F",{"id":428,"parent":420,"target":257,"content":429,"title":429,"url":430},2484,"Staf Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstaf-perpustakaan\u002F",{"id":432,"parent":420,"target":257,"content":433,"title":433,"url":434},2485,"Struktur Organisasi Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstruktur-organisasi-perpustakaan\u002F",{"id":436,"parent":420,"target":257,"content":437,"title":437,"url":438},2486,"Tata Tertib","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Ftata-tertib\u002F",{"id":440,"parent":420,"target":257,"content":441,"title":441,"url":442},3705,"Statistik","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstatistik\u002F",{"id":444,"parent":420,"target":257,"content":445,"title":445,"url":446},4990,"Standard Operating Procedure (SOP)","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstandard-operating-procedure-sop-2\u002F","profil"]