[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"ssr-repo-dspace000003011":3},{"id":4,"title":5,"authors":6,"files":8,"advisors":53,"authors_detail":54,"advisors_detail":58,"publisher":59,"publish_place":60,"language":61,"type":62,"type_slug":63,"year":64,"department":65,"study_program":66,"keywords":67,"keywords_detail":71,"abstract":78,"abstract_html":79,"url":80},"repo-dspace000003011","Project Planning Pembangunan Gedung ITB Science Techno Park",[7],"Rahmasyifa Siti Chairunnisa",[9,14,17,20,23,26,29,32,35,38,41,44,47,50],{"chapter":10,"requires_login":11,"label":12,"available":13},"abstrak",false,"Abstrak",true,{"chapter":15,"requires_login":11,"label":16,"available":11},"pendahuluan","Pendahuluan",{"chapter":18,"requires_login":11,"label":19,"available":13},"bab1","Bab I",{"chapter":21,"requires_login":11,"label":22,"available":13},"bab2","Bab II",{"chapter":24,"requires_login":13,"label":25,"available":13},"bab3","Bab III",{"chapter":27,"requires_login":13,"label":28,"available":13},"bab4","Bab IV",{"chapter":30,"requires_login":13,"label":31,"available":13},"bab5","Bab V",{"chapter":33,"requires_login":13,"label":34,"available":11},"bab6","Bab VI",{"chapter":36,"requires_login":13,"label":37,"available":11},"bab7","Bab VII",{"chapter":39,"requires_login":11,"label":40,"available":11},"daftar_pustaka","Daftar Pustaka",{"chapter":42,"requires_login":13,"label":43,"available":11},"lampiran","Lampiran",{"chapter":45,"requires_login":13,"label":46,"available":11},"jurnal","Jurnal",{"chapter":48,"requires_login":11,"label":49,"available":13},"open","Akses Terbuka",{"chapter":51,"requires_login":13,"label":52,"available":13},"full","Dokumen Lengkap",[],[55],{"name":7,"nim":56,"slug":57},"2341327019","rahmasyifa-siti-chairunnisa",[],"Politeknik Negeri Malang","Malang","Indonesia","Skripsi (D4)","skripsi-d4",2025,"D-IV MANAJEMEN REKAYASA KONSTRUKSI",null,[68,69,70],"Alternatif","Project Planning","Metode Pelaksanaan",[72,74,76],{"name":68,"slug":73},"alternatif",{"name":69,"slug":75},"project-planning",{"name":70,"slug":77},"metode-pelaksanaan","Proyek pembangunan ITB Science Techno Park merupakan kawasan inovasi yang bertujuan untuk menginkubasi dan mendorong pertumbuhan baru di Indonesia. Proyek pembangunan ITB Science Techno Park mengalami keterlambatan dalam penyelesaian karena beberapa kendala seperti kurang efisiensinya penggunaan alat berat, kurang optimalnya dalam menerapkan metode pelaksanaan yang telah direncanakan, terlambatnya material di on site, dan terdapat perubahan desain. Tujuan dari skripsi ini adalah untuk memberikan alternatif pada Struktur Organisasi, Site Layout dan Traffic Management, Strategi Pelaksanaan, Metode Pelaksanaan, Rencana Mutu, Rencana K3L, Penjadwalan, Biaya dan Kurva S. Data yang diperlukan adalah Peta Lokasi dan Batas Wilayah, Gambar Perencanaan, Harga Satuan Dasar Kota Bandung 2022, dan Rencana Kerja Dan Syarat. Microsoft Project 2019 untuk menyusun penjadwalan dan Microsoft Excel 2019 untuk menghitung Rencana Anggaran Pelaksanaan (RAP) dan Kurva S. Alternatif project planning menghasilkan (1) Struktur organisasi fungsional (2) Site layout berdasarkan perhitungan safety index dan travelling distance dan traffic management (3) Strategi pelaksanaan pekerjaan tiang pancang terbagi menjadi 6 zona, galian basement 3 zona, pekerjaan pile cap dan tie beam 4 zona, pekerjaan basement 4 zona, pekerjaan struktur atas 2 zona, dan arsitektur 1 zona, menggunakan metode half slab pada plat lantai, dan mengganti bahan bekisting berupa phenolic (4) Pengendalian mutu berdasarkan SOP dan ITP yang mengacu pada Spesifikasi Teknis (5) Rencana K3L disusun terdiri atas tujuan dan kebijakan keselamatan konstruksi, struktur organisasi K3, prosedur tanggap darurat, tabel IBPRP, sasaran dan program umum (6) Jadwal pelaksanaan proyek 423 hari kalender (7) Total rencana anggaran pelaksanaan (RAP) sebesar Rp 223.758.567.303.","\u003Cp>Proyek pembangunan ITB Science Techno Park merupakan kawasan inovasi yang bertujuan untuk menginkubasi dan mendorong pertumbuhan baru di Indonesia. Proyek pembangunan ITB Science Techno Park mengalami keterlambatan dalam penyelesaian karena beberapa kendala seperti kurang efisiensinya penggunaan alat berat, kurang optimalnya dalam menerapkan metode pelaksanaan yang telah direncanakan, terlambatnya material di on site, dan terdapat perubahan desain. Tujuan dari skripsi ini adalah untuk memberikan alternatif pada Struktur Organisasi, Site Layout dan Traffic Management, Strategi Pelaksanaan, Metode Pelaksanaan, Rencana Mutu, Rencana K3L, Penjadwalan, Biaya dan Kurva S. Data yang diperlukan adalah Peta Lokasi dan Batas Wilayah, Gambar Perencanaan, Harga Satuan Dasar Kota Bandung 2022, dan Rencana Kerja Dan Syarat. Microsoft Project 2019 untuk menyusun penjadwalan dan Microsoft Excel 2019 untuk menghitung Rencana Anggaran Pelaksanaan (RAP) dan Kurva S. Alternatif project planning menghasilkan (1) Struktur organisasi fungsional (2) Site layout berdasarkan perhitungan safety index dan travelling distance dan traffic management (3) Strategi pelaksanaan pekerjaan tiang pancang terbagi menjadi 6 zona, galian basement 3 zona, pekerjaan pile cap dan tie beam 4 zona, pekerjaan basement 4 zona, pekerjaan struktur atas 2 zona, dan arsitektur 1 zona, menggunakan metode half slab pada plat lantai, dan mengganti bahan bekisting berupa phenolic (4) Pengendalian mutu berdasarkan SOP dan ITP yang mengacu pada Spesifikasi Teknis (5) Rencana K3L disusun terdiri atas tujuan dan kebijakan keselamatan konstruksi, struktur organisasi K3, prosedur tanggap darurat, tabel IBPRP, sasaran dan program umum (6) Jadwal pelaksanaan proyek 423 hari kalender (7) Total rencana anggaran pelaksanaan (RAP) sebesar Rp 223.758.567.303.\u003C\u002Fp>","https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=dspace000003011&year=2025&title=project-planning-pembangunan-gedung-itb-science-techno-park"]