[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"ssr-repo-browse-{\"subject\":\"penjadwalan-proyek\",\"page\":1}":3,"menu-footer-id":72,"menu-main-id":134},{"rows":4,"meta":64},[5,16,21,29,36,43,51,58],{"id":6,"source":7,"branch":8,"branch_name":8,"title":9,"authors":10,"publisher":8,"year":12,"type":13,"call_number":8,"isbn":8,"cover":8,"abstract":14,"availability":8,"url":15},"repo-dspace000006504","repo",null,"Project Planning Proyek Pembangunan Jalur Lintas Selatan Lot 1A Brumbun - Pantai Sine Kab. Tulungagung Sta 2+900 -12+450",[11],"Azriel Maulana Akbar",2025,"Skripsi (D4)","Jalur Lintas Selatan (JLS) merupakan jalan raya yang membentang di wilayah selatan Pulau Jawa dan dirancang untuk menghubungkan beberapa kota besar di Jawa Timur dan Jawa Tengah. Oleh karena itu pemerintah terus berupaya membangun jalan untuk mendukung pertumbuhan ekonomi, sosial, dan kesejahteraan…","https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=dspace000006504&year=2025&title=project-planning-proyek-pembangunan-jalur-lintas-selatan-lot-1a-brumbun-pantai-sine-kab-tulungagung-sta-2-900-12-450",{"id":17,"source":7,"branch":8,"branch_name":8,"title":18,"authors":19,"publisher":8,"year":12,"type":13,"call_number":8,"isbn":8,"cover":8,"abstract":14,"availability":8,"url":20},"repo-dspace000006472","Project Planning Jalur Lintas Selatan Lot 1A Brumbun – Pantai Sine Kab. Tulungagung STA 2+900-12+450",[11],"https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=dspace000006472&year=2025&title=project-planning-jalur-lintas-selatan-lot-1a-brumbun-pantai-sine-kab-tulungagung-sta-2-900-12-450",{"id":22,"source":7,"branch":8,"branch_name":8,"title":23,"authors":24,"publisher":8,"year":12,"type":26,"call_number":8,"isbn":8,"cover":8,"abstract":27,"availability":8,"url":28},"repo-dspace000006165","Perhitungan Anggaran Biaya dan Penjadwalan pada Proyek Pembangunan Hotel Frontone Luxe di Kota Surakarta",[25],"Alex Ridwan Ghaniyyu","Tugas Akhir (D3)","Kajian ini memuat perhitungan ulang anggaran biaya serta penjadwalan proyek sebagai langkah strategis dalam menjamin keberhasilan pelaksanaan proyek konstruksi. Tugas Akhir ini bertujuan untuk melakukan rekalkulasi anggaran biaya dan penjadwalan ulang pada proyek pembangunan Hotel FrontOne Luxe di…","https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=dspace000006165&year=2025&title=perhitungan-anggaran-biaya-dan-penjadwalan-pada-proyek-pembangunan-hotel-frontone-luxe-di-kota-surakarta",{"id":30,"source":7,"branch":8,"branch_name":8,"title":31,"authors":32,"publisher":8,"year":12,"type":13,"call_number":8,"isbn":8,"cover":8,"abstract":34,"availability":8,"url":35},"repo-dspace000002817","Implementasi BIM 4D dan 5D dalam Perencanaan Pembangunan Apartemen LRT City Cibubur",[33],"Daffaulhaq","Proyek Apartemen LRT City Cibubur dengan luas lahan 2.110,02 m² menghadapi permasalahan akibat penggunaan metode konstruksi konvensional yang menyebabkan tidak adanya integrasi biaya dan keterlambatan jadwal akibat terbatasnya informasi untuk melacak lintasan kritis. Hal ini memicu ketidakakuratan…","https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=dspace000002817&year=2025&title=implementasi-bim-4d-dan-5d-dalam-perencanaan-pembangunan-apartemen-lrt-city-cibubur",{"id":37,"source":7,"branch":8,"branch_name":8,"title":38,"authors":39,"publisher":8,"year":12,"type":26,"call_number":8,"isbn":8,"cover":8,"abstract":41,"availability":8,"url":42},"repo-dspace000001261","Perencanaan Ulang Jadwal dan Anggaran Biaya Jembatan Sungai Kaliurang pada Proyek Jalur Lintas Selatan Lot. 3 Pantai Serang - Sumbersih (Studi Kasus : Pembangunan Jalur Lintas Selatan Lot. 3 Pantai Serang - Sumbersih (STA 0+040 s.d. STA 4+374)",[40],"Farhan Nur Muhammad","Jembatan Sungai Kaliurang pada Proyek Jalur Lintas Selatan Lot. 3 Pantai Serang - Sumbersih berlokasi di STA 2+352 sampai dengan STA 2+438, Desa Sumbersih, Kec.Panggungrejo, Kab. Blitar, Provinsi Jawa Timur yang memiliki panjang total 86 meter. Maksud dan tujuan dari laporan akhir ini untuk…","https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=dspace000001261&year=2025&title=perencanaan-ulang-jadwal-dan-anggaran-biaya-jembatan-sungai-kaliurang-pada-proyek-jalur-lintas-selatan-lot-3-pantai-serang-sumbersih-studi-kasus-pembangunan-jalur-lintas-selatan-lot-3-pantai-serang-sumbersih-sta-0-040-s-d-sta-4-374",{"id":44,"source":7,"branch":8,"branch_name":8,"title":45,"authors":46,"publisher":8,"year":48,"type":13,"call_number":8,"isbn":8,"cover":8,"abstract":49,"availability":8,"url":50},"repo-dspace000003878","Project Planing Preservasi Jalan dan Jembatan Tumbang Samba - Rabambang",[47],"Dheo H Darmawan",2024,"Proyek Preservasi Jalan dan Jembatan Tumbang Samba - Rabambang merupakan proyek perawatan rutin dan rekonstruksi dengan total panjang 74,200 km. Proyek ini mencakup pekerjaan perawatan rutin jalan, rekonstruksi dan rehabilitasi, serta rekonstruksi dan penggantian jembatan. Mengingat panjangnya…","https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=dspace000003878&year=2024&title=project-planing-preservasi-jalan-dan-jembatan-tumbang-samba-rabambang",{"id":52,"source":7,"branch":8,"branch_name":8,"title":53,"authors":54,"publisher":8,"year":56,"type":26,"call_number":8,"isbn":8,"cover":8,"abstract":8,"availability":8,"url":57},"repo-doc202109004634","Metode Penjadwalan Dan Rencana Anggaran Biaya Pada Proyek Jembatan Pogoh Kecamatan Loceret Kabupaten Nganjuk",[55],"DWIKI ALFIAN",2020,"https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=doc202109004634&year=2020&title=metode-penjadwalan-dan-rencana-anggaran-biaya-proyek-jembatan-pogoh-kecamatan-loceret-kabupaten-nganjuk",{"id":59,"source":7,"branch":8,"branch_name":8,"title":60,"authors":61,"publisher":8,"year":56,"type":26,"call_number":8,"isbn":8,"cover":8,"abstract":8,"availability":8,"url":63},"repo-doc202109002379","Perhitungan Ulang Rencana Anggaran Biaya dan Penjadwalan Proyek Pembangunan Jembatan Kaligambir Sumbersih Kecamatan Panggungrejo Kabupaten Blitar",[62],"ARASY SOSROBAHU","https:\u002F\u002Frepository.polinema.ac.id\u002Fcollection\u002Fdetail?id=doc202109002379&year=2020&title=perhitungan-ulang-rencana-anggaran-biaya-dan-penjadwalan-proyek-pembangunan-jembatan-kaligambir-sumbersih-kecamatan-panggungrejo-kabupaten-blitar",{"page":65,"per_page":66,"total":67,"last_page":65,"filter":68,"label":71},1,20,8,{"subject":69},{"slug":70,"name":71},"penjadwalan-proyek","Penjadwalan Proyek",[73,96,113],[74,80,84,88,92],{"id":75,"parent":76,"target":77,"content":78,"title":78,"url":79},2500,"0","","Polinema Malang","https:\u002F\u002Fpolinema.ac.id\u002F",{"id":81,"parent":76,"target":77,"content":82,"title":82,"url":83},2536,"Bahasa","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-bahasa\u002F",{"id":85,"parent":76,"target":77,"content":86,"title":86,"url":87},2537,"Humas","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-humas\u002F",{"id":89,"parent":76,"target":77,"content":90,"title":90,"url":91},2538,"MKU","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-mku\u002F",{"id":93,"parent":76,"target":77,"content":94,"title":94,"url":95},2539,"Penelitian dan Pengabdian","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-p2m\u002F",[97,101,105,109],{"id":98,"parent":76,"target":77,"content":99,"title":99,"url":100},2771,"Percetakan","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-percetakan\u002F",{"id":102,"parent":76,"target":77,"content":103,"title":103,"url":104},2772,"Pemeliharaan dan Perawatan","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Funit-pelaksana-teknis\u002Fupt-pp\u002F",{"id":106,"parent":76,"target":77,"content":107,"title":107,"url":108},2773,"Pusat Komputer","https:\u002F\u002Fwww.polinema.ac.id\u002Flayanan\u002Fpuskom\u002F",{"id":110,"parent":76,"target":77,"content":111,"title":111,"url":112},2775,"Job Placement Center","http:\u002F\u002Fjpc.polinema.ac.id\u002F",[114,118,122,126,130],{"id":115,"parent":76,"target":77,"content":116,"title":116,"url":117},2501,"Admisi","http:\u002F\u002Fadmisi.polinema.ac.id\u002F",{"id":119,"parent":76,"target":77,"content":120,"title":120,"url":121},2570,"Alumni","http:\u002F\u002Falumni.polinema.ac.id\u002F",{"id":123,"parent":76,"target":77,"content":124,"title":124,"url":125},2571,"Beasiswa","http:\u002F\u002Fbeasiswa.polinema.ac.id\u002F",{"id":127,"parent":76,"target":77,"content":128,"title":128,"url":129},2572,"LPSE","http:\u002F\u002Flpse.polinema.ac.id\u002Feproc4",{"id":131,"parent":76,"target":77,"content":132,"title":132,"url":133},2574,"Simpeg","https:\u002F\u002Fsimpeg.polinema.ac.id\u002F",[135,194,212,234],{"id":136,"parent":76,"target":77,"content":137,"title":137,"url":138,"children":139,"dropdown":193},2534,"Layanan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002F",[140,145,149,153,157,161,165,169,173,177,181,185,189],{"id":141,"parent":142,"target":77,"content":143,"title":143,"url":144},2474,"2534","Koleksi Umum","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-umum\u002F",{"id":146,"parent":142,"target":77,"content":147,"title":147,"url":148},2493,"Sirkulasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fsirkulasi\u002F",{"id":150,"parent":142,"target":77,"content":151,"title":151,"url":152},2475,"Loker","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Floker\u002F",{"id":154,"parent":142,"target":77,"content":155,"title":155,"url":156},2492,"Referensi dan Karya Ilmiah","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-referensi-dan-laporan-akhir\u002F",{"id":158,"parent":142,"target":77,"content":159,"title":159,"url":160},3792,"Layanan Penelusuran Informasi Secara Online","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-penelusuran-informasi-secara-online\u002F",{"id":162,"parent":142,"target":77,"content":163,"title":163,"url":164},4460,"Layanan Keanggotaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-keanggotaan-2\u002F",{"id":166,"parent":142,"target":77,"content":167,"title":167,"url":168},3745,"Baca Ditempat","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-baca-ditempat\u002F",{"id":170,"parent":142,"target":77,"content":171,"title":171,"url":172},2473,"Koleksi Tandon","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fkoleksi-tandon\u002F",{"id":174,"parent":142,"target":77,"content":175,"title":175,"url":176},3823,"Jasa Silang Layan Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fjasa-silang-layan-perpustakaan\u002F",{"id":178,"parent":142,"target":77,"content":179,"title":179,"url":180},3832,"Layanan Multimedia","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-multimedia\u002F",{"id":182,"parent":142,"target":77,"content":183,"title":183,"url":184},3834,"Layanan Literasi Informasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-literasi-informasi\u002F",{"id":186,"parent":142,"target":77,"content":187,"title":187,"url":188},3835,"Layanan Penyedia Dokumen","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Flayanan-penyedia-dokumen\u002F",{"id":190,"parent":142,"target":77,"content":191,"title":191,"url":192},2489,"Administrasi Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fadministrasi-perpustakaan\u002F","layanan",{"id":195,"parent":76,"target":77,"content":196,"title":196,"url":197,"children":198,"dropdown":211},2838,"e-Resources","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fe-book\u002F",[199,203,207],{"id":200,"parent":201,"target":77,"content":202,"title":202,"url":197},2577,"2838","e-Book",{"id":204,"parent":201,"target":77,"content":205,"title":205,"url":206},2578,"e-Journal","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fe-journal\u002F",{"id":208,"parent":201,"target":77,"content":209,"title":209,"url":210},90001,"Open Access","https:\u002F\u002Flibrary.polinema.ac.id\u002Fe-resources\u002Fopen-access\u002F","e-resources",{"id":213,"parent":76,"target":77,"content":214,"title":214,"url":215,"children":216,"dropdown":233},2837,"Informasi","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fpengumuman\u002F",[217,222,225,229],{"id":218,"parent":219,"target":77,"content":220,"title":220,"url":221},2491,"2837","Jam Layanan","https:\u002F\u002Flibrary.polinema.ac.id\u002Flayanan\u002Fjam-layanan\u002F",{"id":223,"parent":219,"target":77,"content":224,"title":224,"url":215},2766,"Pengumuman",{"id":226,"parent":219,"target":77,"content":227,"title":227,"url":228},2514,"Berita","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fberita\u002F",{"id":230,"parent":219,"target":77,"content":231,"title":231,"url":232},2515,"Artikel","https:\u002F\u002Flibrary.polinema.ac.id\u002Fcategory\u002Fartikel\u002F","informasi",{"id":235,"parent":76,"target":77,"content":236,"title":236,"url":237,"children":238,"dropdown":268},2482,"Profil","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002F",[239,244,248,252,256,260,264],{"id":240,"parent":241,"target":77,"content":242,"title":242,"url":243},2483,"2482","Sejarah","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fsejarah\u002F",{"id":245,"parent":241,"target":77,"content":246,"title":246,"url":247},2487,"Visi, Misi dan Tujuan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fvisi-misi-dan-tujuan\u002F",{"id":249,"parent":241,"target":77,"content":250,"title":250,"url":251},2484,"Staf Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstaf-perpustakaan\u002F",{"id":253,"parent":241,"target":77,"content":254,"title":254,"url":255},2485,"Struktur Organisasi Perpustakaan","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstruktur-organisasi-perpustakaan\u002F",{"id":257,"parent":241,"target":77,"content":258,"title":258,"url":259},2486,"Tata Tertib","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Ftata-tertib\u002F",{"id":261,"parent":241,"target":77,"content":262,"title":262,"url":263},3705,"Statistik","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstatistik\u002F",{"id":265,"parent":241,"target":77,"content":266,"title":266,"url":267},4990,"Standard Operating Procedure (SOP)","https:\u002F\u002Flibrary.polinema.ac.id\u002Fprofil\u002Fstandard-operating-procedure-sop-2\u002F","profil"]