Perencanaan Perawatan Dan Perbaikan Pada Bogie Tipe MB-514 Di Kereta Rel Listrik Bandara Soekarno-Hatta EA-203 Periode 2023 - 2027
Maintenance Planning For Bogie Type MB-514 Of Soekarno-Hatta Airport EA-203 Electric Multiple Unit Train In 2023 - 2027 Periods
Bogie is one of the main components of EMU and Trains in general, Bogie became one of the main components which functions are directly related to train operations, passenger safety, and comfort. Therefore, in order to maximize the work function of Bogie, a Maintenance method is required in such ways so that it can get high reliability and efficiency. The method used in Bogie Maintenance planning uses the Preventive Maintenance methods. However, there are problems with the elements of existing Maintenance methods, it's on Preventive Maintenance specifically on Daily Maintenance part. In carrying out Daily Maintenance for Bogie, there's weakness & lack of efficiency and it decreases the Reliability of the Bogie itself. It requires a plan that can increase the effectiveness of existing Maintenance methods, that is by using one of the Total Productive Maintenance pillars, namely Autonomous Maintenance. Autonomous Maintenance is a Maintenance method that is considered to emphasize the level of effectiveness in Daily Maintenance. This Autonomous Maintenance is applied to Daily Maintenance to support the quality of Maintenance results that have been carried out already. the biggest cost that is required to perform Maintenance on Bogie is when the PA /Final Maintenance is carried out. Meanwhile, the total required cost of Maintenance for the 2023 to 2027 periods is Rp 906.412.430