Metode Pelaksanaan Dan Penjadwalan Underpass Jalan Desa STA 9 560 pada Tol Solo - Yogyakarta - NYIA Kulonprogo
Methods of Implementation and Scheduling of the STA 9 560 Village Road Underpass on the Solo - Yogyakarta Toll Road - NYIA Kulonprogo
The preparation of this final project discusses the Implementation Method and Scheduling of the Keprabon STA 9+560 village road Underpass on the Solo – Yogyakarta – NYIA Kulon Progo Toll Road which is one of the structural buildings in the Solo – Yogyakarta – NYIA Kulon Progo Toll Road construction project, the underpass becomes a copy. below the surface which is usually used for vehicular traffic (generally cars or trains) as well as for pedestrians or cyclists. The data needed to complete this Final Project include: Working Drawings, Implementation Methods, S Curve, and Bandung City HSPK. With this data, the required implementation and scheduling methods are planned. Planning the implementation method must be precise and efficient in order to function optimally. From the results of observations and calculations on the project, the cost required for the construction of the keprabon village road Underpass STA 9+560 on the Solo – Yogyakarta – NYIA Kulon Progo Toll Road is Rp. 5,602,809,005,588 and it takes 99 days.