Perencanaan Ulang Geometrik dan Drainase pada Jalan Akses 2 Proyek Bendungan Jlantah Kabupaten Karanganyar (STA 0 000 - STA 2 220)
Geometric Replanning and Drainage on Access Road 2 Dam Project Jlantah Karanganyar Regency (STA 0 000 - STA 2 220)
Roads have an important role in life, among others, as an access link between regions. Access Road 2 Dam Project Jlantah Karanganyar Regency is 2.22 km long and is faced with 33 bends facing the driver. This final report aims to replan the bend so that it can be an alternative to initial planning using the 2021 Geometric Design Guidelines (PDGJ). Seeing the frequent occurrence of rain in the area, a 2021 Road drainage channel is planned. Based on the results of geometric alternative planning using new guidelines on Access Road 2 Dam Project Jlantah Karanganyar Regency obtained 18 bends consisting of 13 S-C-S bends and 4 F-C bends for horizontal alignment. As for the vertical alignment, there are 8 vertical arches with 5 convex vertical arches and 3 concave vertical arches. The number of excavations and embankments from the re-planning resulted in a total excavation of 200251.145 m³ and a total embankment of 59690.470 m³. The dimensions of the drainage channel made of river stone are obtained in the upstream with a width of 0.6 meters and a height of 0.8 meters, in the downstream area with a width of 0.7 meters and a height of 0.9 meters. The total cost for all work is Rp. 31,171,800,000.00,-