Penentuan Kebutuhan Pompa Berdasarkan Kapasitas Pompa Miltiflow 420 EX dan Perencanaan Dimensi Sump pada Tambang Batubara PT Kalimantan Prima Persada Jobsite Rantau Pit Cendana Kabupaten Tapin Provinsi Kalimantan Selatan
Determination of Pump Needs Based on Miltiflow 420 EX Pump Capacity and Sump Dimension Planning at the Coal Mine of PT Kalimantan Prima Persada Jobsite Rantau Pit Cendana Tapin Regency, South Kalimantan Province
Muhammad Anugrah Sidik Purnomo
PT Kalimantan Prima Persada is a coal contractor company. The coal mining system by PT Kalimantan Prima Persada uses open pit system with strip mining method. Surface mining is likely affected by weather condition, especially during raining condition. The rainfall data using gumbell methods year 2011 – 2020, obtained the rainfall plan is 117,57 mm, with average raining hour in 10 years on the year 2011 – 2020 is 4,34 hours, rainfall intensity 15,29 mm/hours, 5-years rainfall return period, and hydrological risks 89,26%. The run off coefficient that used in the research area is 0,9 and the catchment area in research area is 0,549 km². The total discharge that enters to the sump pit Cendana is 2,10 m3/second atau 7.560 m3/hour atau 32.810,4 m3/day. Cendana Pit Sump uses two Multiflow 420 EX Pumps with pump discharge is 848 m3/hour.