Analisis Perencanaan Penambahan Transformator Baru dan JTM 20 kV Pada PT. Multi Pakan Jaya Sentosa Jombang Jawa Timur

The Planning Of Analysis Adding New Transformers And 20 kV Medium Voltage Network In Multi Pakan Jaya Sentosa Company Jombang East Java

DERY SIDARTAH

Discussing about the planning of adding new transformers to PT. Multi Pakan Jaya Sentosa, Jombang, East Java, one of the plans for adding new transformers due to the increasing load on PT. Multi Pakan Jaya Sentosa. Planning for the adding of new transformers also comes with safety units. The planned transformer serves to reduce the voltage of 20 kV from the medium voltage network to a low voltage 380/220 Volt. At present the installed transformer is 2000 kVA with a total installed load of 2848.51 kVA thus planning a new transformer with a capacity of 1000 kVA. As well as an analysis of medium voltage network 20 KV with the addition of a new transformer, the area of medium voltage network 20 KV is 150 mm2 with the total current flowing in JTM is 242,4858 A.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.26.1 · de96334