Studi Perencanaan Peralatan Elektrikal Gas Insulated Switchgear (GIS) 150 kV di GI Blimbing
Study on Electrical Equipment Planning for Gas Insulated Switchgear (GIS) 150 kV at GI Blimbing
DINAR WULAN HASTATIMUR TAUFANY, FARAH DITA FEYQA
PT. PLN (Persero) is a State Electrical Company that plans and implements power projects in entire Indonesia. Based on RUPTL 2019-2028, the projected growth rate of the need for electrical power in East Java is 4.97%. Therefore, to fulfill the demand, PT. PLN (Persero) did the development of the substations, it is Blimbing Substation. Blimbing Substation operated on 80 MVA at 70 kV using a conventional type and using air as their isolation and rebuild into 180 MVA on 150 kV. Therefore, it needs to re-planning the electrical equipment for GIS 150 kV Blimbing Baru. The purpose of the Final Study is first to analyze the load growth rate in Blimbing Substation for a decade, and the impact on the loading capacity before and after updating the transformers. Second, we need to analyze how much area is going to use for GIS 150 kV Blimbing Baru, and last is to plan electrical equipment specifications and Single Line Diagram (SLD) at GIS 150 kV Blimbing Baru. Based on the analysis, we can conclude the growth rate for a decade (2019-2028) cause the need to update transformers in Blimbing Substation by considering the area. The Blimbing substation will develop into Gas Insulated Switchgear (GIS) using SF6 gas as their insulation media. A change in voltage level and the capacity of the substation cause electrical equipment in Blimbing Substation has changed the specifications. There are CB and DS is using has rating current of 2000 A with a breaking capacity of 40 kA, the CT used has a current ratio of 2000/1 A on the secondary side and 300/1 A on the primary side. The PT used has a voltage ratio of 170000/110 V, and for the LA used has a rating of 20 kA.