Analisis Perawatan Pompa ESP Sumur Iodium dengan Metode Reliability Centered Maintenance

The Analysis of Maintenance Iodin Well ESP Pump on the Reliability Centered Maintenance Method

AFRIZAL ZULMI

The reliability of an equipment or system greatly supports a company's productivity. One way to maintain the reliability of an existing equipment or system is to determine the proper scheduling of equipment maintenance. This case study This case study is to conduct maintenance planning of the WDD2 and WD3 iodine well units of PT Kimia Farma plant Watudakon, Jombang, East Java. The purpose of the study is to calculate the reliability value that will be determined in the future maintenance intervals that will support the reliability of the tool, and will reduce the cost of repairs made so far. The method of the study is reliability centered maintenance (RCM). RCM is a maintenance strategy that provides a structured and systematic method for analyzing the functions and failures of a physical asset that is focused on maintaining the function of the asset. Analysis using the RCM method uses two types of data, namely qualitative data and quantitative data. The data used as a reference for this research is period January 2016 - December 2019. The quantitative analysis of this research is in the form of reliability value. From the reliability value, it can be determined the value of the maintenance time interval and estimated maintenance costs. While qualitative analysis will produce failure mode and effect analysis. The results of the study are the reliability value on the WDD two iodine well get a value of 0.5 at t = 432 hours and WD three get a value of 0.5 at t = 168 hours. From the reliability value, it can be taken the recommended maintenance interval, which is the WDD two iodine well for eighteen days and WD three for seven days. While the estimation obtained if using the recommended time interval, the WDD two iodine well is Rp.312,600,000 and for WD three Rp. 430,200,000. If the estimated cost calculation in 2019 WDD two iodine well costs Rp. 543,200,000 and WD three spent Rp. 493,200,000, it will save Rp 230,600,000 for WDD two and Rp. 63,000,000.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.18.2 · ee0bb0b