Perencanaan Perawatan Dan Perbaikan Pada Bogie Kereta Api Tipe Tb-1014 Periode 2020 S.D. 2024
Planning Of Maintenance And Repair Of Bogie Train Type Tb-1014 Period 2020 Until 2024
Bogie is a construction consisting of two or more sets of wheels that are joined by a frame equipped with a braking, braking system, with or without movable and non-slip equipment, and as a whole serves as a support for the basic frame of the train body. Several times was found damages in the bogie component. To solve the problem of Bogie component damage, it need hold a planning of maintenance and repair to the bogie. The method used is preventive maintenance and corrective maintenance. This method is performed to find the cause of the damage and provide solutions to reduce the risk of damage again. The planning maintenance and repairs carried out for 5 years, in 2020 up to 2024 at a total estimated costs is Rp. 339.741.117