Perencanaan Perawatan dan Perbaikan Main Guide Bearing Grease Pump Type EP-25 LA Periode 2021 s/d 2025

The Maintenance and Repair Planning of Main Guide Bearing Grease Pump Type EP-25 LA Periods of 2021 to 2025

MUCH. ALDIAN PAMUNGKAS

PT. PJB UP Brantas is one of the companies of hydroelectric power (PLTA). Electricity becomes a very important thing and at this time the public can not be separated from electrical related activities, therefore power generation companies must work continuously to produce electricity. In the production process, there are several machines that must operate continuously one of them is the main guide bearing grease pump. Main guide Bearing grease pump is a very important tool when the electrical production process of this machine serves to lubricating the main guide bearings in the turbine, therefore the condition of the engine main guide bearing grease pump must always be maintained in order to operate optimally. The damage that may occur to the main guide bearing grease pump is that the grease pump does not work, the alarm lamp lights up, the heat line pipe, the leaking line pipe, and the distributing valve do not operate normally. To minimize the existing damage necessary maintenance and repair planning. Maintenance and repair activities of main guide bearing grease pump include: Preventive maintenance period 1 week, preventive maintenance period 1 month, period corective maintenance 3 months, and overhaul period 1 year. Cost estimation of maintenance and repair of engine main guide bearing grease pump period 2021 s/d 2025 is Rp. 114.373.449,48

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.26.1 · de96334