Perencanaan Ulang Geometrik dan Perkerasan Ruas Jalan Lintas Selatan LOT 7 Sta 0+000 s/d Sta 5+000

Geometric Redesign and Pavement for Southern Cross Road LOT 7 from STA 0+000 until STA 5+000

MULIA RAMADHANIA HASIM

The LOT 7 Southern Cross Road construction project in Blitar Regency in this road replanning must be optimal. This study aims to design the road geometric, find the thickness of the flexible pavement for road construction, determine the implementation method and calculate the required cost budget. The required secondary data were of topographic maps, California Bearing Ratio, and traffic data. The rules of road geometry road design was the reference of the section uses the 2017 road pavement design manual method, work unit price of PU Bina Marga was for estimating the cost. The replanning of the southern causeway, result in 7 m the width of the road, 2,5 m with a secondary collector road type and 2 bends with 11 SCS bends and 7 SS bends are obtained. Total pavement and roads sholder, kolektor type of road, flexible pavement at 20 year planned the AC - WC foundation layer 40 mm, 60 mm AC - BC layer, 80 mm AC – Base layer and 300 mm surface course layer, and at Rp. 191.873.420.512.093,-

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed