Project Planning Pembangunan Jalan Tol Duri Utara - Dumai

The Construction Project Planning of Duri Utara - Dumai Toll Road

CLARA OVILIA NINGSIH

Aponno, M.S. Pekanbaru – Dumai Toll Road construction project is a series of Trans Sumatra Toll Road program along 2,818 km in Indonesia and is divided into 6 sections including, section 6 for the North Duri – Dumai section with a length of 25.05 km. The success of a project is largely determined by the wisdom taken when starting and completing the project needs to be planned, organized, directed, coordinated and supervised as well as possible, good planning is needed, among others, taking into account efficient time, efficient costs and quality. The purpose of this planning is to determine: (1) organizational structure, (2) site layout, (3) grouping of work, (4) method of implementation, (5) quality, (6) K3L, (7) scheduling, (8) cost. Data required including technical drawings; Work Breakdown Structure (WBS); Unit price of workers, materials and tools of Riau province 2018 used to determine the estimated cost. Microsoft Project 2013 is used for scheduling through the Precedence Diargram Method (PDM) and barchart, and Microsoft Excel 2010 is used to calculate cost estimates and curves – S. Project Planning produces (1) a functional organizational structure according to the job list (2) an effective layout by in and out of the office area (3) making WBS from existing work (4) work methods according to field conditions (5) quality meets technical specifications and SOP (Standard Operation Procedure) (6) wearing Personal Protective Equipment (APD) and placing work signs (7) 411 working calendar days (8) for Rp.3,046,714,000,000, -

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.20.5 · 33e0fa7