Studi Kelayakan Teknis dan Finansial Proyek Pembangunan Area Bisnis dan Permukiman di Kawasan Terpadu Kaliakah, Kec. Negara, Kab. Jembrana, Prov. Bali

The Analysis of Technical and Financial Feasibility Study of Business Area and Residence in Kawasan Terpadu Kaliakah Kabupaten Jembrana Provinsi Bali

AHMAD YUSRON

2,775-ha Kawasan Terpadu Kaliakah (Compound) construction project is being carried out, so it requires an evaluation to find out the technical feasibility of applicable regulations, the overall cost, the income from sale, the financial feasibility study, and sensitivity analysis. The required data were of basic design, work unit price analysis (AHSP) of PERMEN PU No.28 year 2016, work and material unit price (HSD) of Provinsi Bali 2018, land cost, and license fee. Technical feasibility study refered to PERMENPERA No.11 year 2008, PERDA Kabupaten Jembrana No. 3 year 2017, and PERDA Kabupaten Jembrana No. 11 year 2012. The parameters used for financial feasibility study are Payback Period (PP), Net Present Value (NPV), Benefit Cost Ratio (BCR), and Internal Rate of Return (IRR). Sensitivity analysis was based on changes of precentage of capital, construction cost, and loan interest rate. The technical feasibility study resulted in 86.25% value of feasibility parameters, so the site plan is appropriate to the feasibility parameters; Rp.46,464,157,929.38 the overall cost; Rp.76,005,143. The financial feasibility study resulted in 4.29 years PP; Rp. 826,151,893 NPV; 1.011 BCR; and 13.156% IRR; the technical and financial appropriate to the feasibility. Sensitivity analysis showed that only the percentage change of capital is not sensitive to NPV, BCR, and IRR.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed