Penyusunan Project Planning Pada Pembangunan Gedung Rusunawa Brebek Sidoarjo

The Project Planning of Rusunawa Brebek Construction Project Sidoarjo

HANIF SETYO BESTARI

4,752-m2 Rusunawa Brebek consisting of five floors needs an alternative project planning to be on time, on quality, and on cost completed with HSE aspects. This thesis aimed to plan structure organisation of the project, site layout, traffic management, construction methods, schedule, quality, safety, and estimation. The data used were of technical drawings, plans and spesifications, work unit price of Sidoarjo 2018. Ms. Project 2007 was used for schedulling andMs. Excel 2013 was used for estimation. The alternative resulted in structure organisation without SAM; site layout with stockyard and quary in one place; traffic management with two different accesses of in and out; construction methods with two zones; on 296 calendar days, quality plan with PDCA (Plan, Do, Check, Action) of every work; safety plan with providing signals; atIDR19,537,340,000.00.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed