Penyusunan Project Planning pada Pembangunan Rumah Sakit Umum Daerah Temayang Kabupaten Bojonegoro

The Project Planning of Temayang Regional General Hospital Bojonegoro East Java

M. AFIFUL RIZA

The 6,925-m2 Temayang Regional General Hospital Bojonegoro consisting of 5 floors is on the area of 23,675m2. It is still in the pre-construction phase, so it needs a project planning. The objectives of this thesis are to plan the site layout and traffic management efficiently and effectively; the structural organization of the project; the strategies and implementation methods; the schedule; the quality control; Safety, Health, and Environment (SHE) programs; and to estimate the cost. The required data were of shop drawings, work plans and terms, and work unit price (HSPK) of Bojonegoro 2018. Occupational Health & Safety study refered to Minister Rules No.4 Year 1987 and OHSAS 18001:2007. The project planning resulted in a complete project structural organization consisting of a project manager on the top hierarchy, a safety health and environment (SHE), a site engineer manager (SEM), a site operational manager (SOM), and a site administration manager (SAM) on the second hierarchy, quality control, quality surveyor, surveyor on the third hierarchy; in site layouts with tower crane and mobile crane and 1 traffic management 1 line with in-gate and out-gate on the project; zoning strategies; bottom-up and conventional implementation methods; on 314 work days; quality control make standard operation procedure and quality target; and JSA (Job Safety Analysis) for SHE program; at Rp.171,912,963,257.00.-

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed