Evaluasi Penerapan SMK3L pada proyek RSI Unisma Tahap 3

Evaluation of Implementation of SMK3L on RSI Unisma Project Phase 3

REALIN ASMUNING KUMALA WATI

HSE in the construction world is very important but is still often ignored as evidenced by the high number of work accidents such as what happened in the RSI Unisma Phase 3 project. . The purpose of this study is to evaluate the SMK3 under Government Regulation Number 50 of 2012, which is divided into several points: 1) work safety, 2) monitoring standard, 3) material management and displacement and 4) commitment maintenance. The method used is by distributing questionnaires with a likert scale assessment. The distribution of the questionnaires took place at the office of the director of the RSI Unisma Phase 3 project by complying with the Health protocol. The results of the questionnaire were processed through data tabulation and then tested for validity and reliability using SPSS 24 which resulted in all variables and statement items being valid and reliable. After that, to determine the percentage of the level of application of SMK3, it is processed using the scoring method. The results of this study are the percentage of SMK3 implementation levels as follows: a) work safety – 77.7%, b) monitoring standards – 81.3%, c) material management – 70.7% and d) commitment maintenance – 82.4 % with a mean of 78%. Thus, the level of implementation of SMK3 in the RSI Unisma Phase 3 project is running quite well and effectively.

Subjek

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed