PERHITUNGAN ULANG PENJADWALAN DAN RAB PADA PROYEK PEMBANGUNAN GEDUNG PUSAT RISET DAN PENGEMBANGAN ILMU UNIVERSITAS JENDERAL SEODIRMAN PURWOKERTO

Re-calculation of Scheduling and RAB in the Development Project of the Center for Research and Science Development at Universitas Jendral Suderman Purwokerto

AMIR BAHRUDIN MAHMUD

The construction of the Center for Research and Science Development at Universitas Jendral Suderman Purwokerto consists of 3 floors with a total building area of 2,070.41 m2. In the construction, it requires a thorough budget planning and scheduling before it is implemented. This final report is prepared to determine the method of implementation, re-planning the schedule and re-planning the budget. The data used in this final report are in the form of unit price for the 2019 budget year of the Banyumas Regency, Technical Drawings and RKS. Job scheduling uses network diagrams namely Precedence Diagram Method (PDM). The results can be created as a Bar Chart that is used to construct the S Curve. From the final report preparation, it is obtained the implementation method using fabrication method, utilizing as much local resources as possible, prioritizing multifunctional work, bottom-up implementation method and incoming material must be checked and monitored. The results of the preparation of the method of implementation, scheduling, and the duration of the scheduling time used in the Construction of the Center for Research and Science Development of Jenderal Soedirman University, obtained the required time duration of 140 days and a budget of Rp 6,213,967,443.00

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.26.1 · de96334