Studi Value Engineering Pada Proyek Pembangunan Pusat Laboratorium Forensik Kota Jayapura

Value Engineering Study on the Construction Project of the Forensic Laboratory Center of Jayapura City

INDRA SYAHRUL RAMADHAN

The construction of the Forensic Laboratory Center aims to meet the needs of the Jayapura Regional Police, which consists of 2 floors with an area of 2488 m2 which costs Rp. 20.360.981.171,25. The purpose of this study is to find out the work items that can be carried out in value engineering analysis, determine the life cycle costs and find out the cost savings. The data used in this study are the Budget Plan (RAB), Work Plan and Requirements (RKS), Detail Engineering Design (DED). The method used in the study carried out five stages including the information stage, the creative stage, the analysis phase, the development stage and the recommendation stage. Determination of work items that can be analyzed using pareto diagrams. The alternative selection was chosen using the zero-one method. From the results of the analysis of value engineering studies, four work items can be analyzed including wall pair work, floor work, plastering work and finishing coat work . Life cycle costs obtained were 507.355.517,72 or 12,44% of the initial cost and construction cost savings of Rp. 433.960.959,05 or 2,13% of the initial cost.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.18.1 · 8c68a2b