Project Planning Proyek Pembangunan Apartemen Tamansari Bintaro Mansion Tangerang Selatan
The Project Planning of Tamansari Bintaro Mansion Apartment Construction Project
Tamansari Bintaro Mansion Apartment construction project by PT. Wika Realty South Tangerang has a building area of 40.695 m2 and on a site area of 6.500 m2 . This high-rise apartment consist of 30 floors and 2 underground floors. However, author only plan to stage 1, which consists of 13 floors and 2 underground floors. This project is located in the middle of the city. As the result, it is rather difficult to access the mobilization of heavy tools and materials. The purpose of this thesis is to make the alternative project planning in terms of traffic management, site layout, method of implementation, quality assurance: safety, health and environment; cost and scheduling. The data used were shop drawings, Work Plans and Conditions, and South Tangerang City HSPK in 2019. The Occupational Health Safety Review were reviewed based on the Number 4 in 1987 and OHSAS 18001:2007. This plan resulted in an alternative project planning: the first was to use two tower cranes and two passenger hoist. The author also plans traffic management alterative by planning to use a two-lane one gate system, left access entry lane and right access exit lane. The implementation method uses a bottom-up method as an alternative. Standard Operating Procedures and Quality Targets created for the implementation quality assurance; safety plan, HSE (Health, Safety, and Environment) organizational structure, HSE equipment plan, and HSE schedule were created for HSE implementation. Bottom-up method in the site costs Rp.74.155.806.619,69 with 434 calendar days.