Perencanaan geometrik dan tebal perkerasan kaku (Ridgid Pavement) pada ruas jalan dari jalan raya Pasirian sampai area tambang di desa Danuredjo, Kecamatan Pasirian, Kabupaten Lumajang, Jawa Timur.

Geometric planning and thickness of rigid pavement on roads from the Pasirian highway to the mining area in Danuredjo Village, Pasirian District, Lumajang Regency, East Java.

YONATAN KRISTIAN MARYONO

The increase in infrastructure development in East Java is directly proportional to the planning of sand requirements. The Sand Mine in the village of Danuredjo Lumajang Regency is one of the suppliers of sand needs in East Java, because of the good quality of the sand and the enormous ease. Sand trucks are used as a mode of transporting sand from consumers to a number of days from day to day which is increasingly causing problems, such as badly damaged roads, traffic jams, collapsed bridges, air rollers and noise. Then we need to plan alternative roads to break up the volume of vehicles, especially sand transport trucks that are passed by careful planning. By making designs that are safe, strong and minimize the number of bends and the number of areas traversed so that it becomes economical. New road planning uses rigid levers which contain the title of the thesis to be made where this title displays 2 alternative paths that compare to each other to choose the best. Road coverage planning, Horizontal Alignment planning and Vertical Alignment where the Alignment planning uses the Bina Marga standard Geometric Planning Procedures for Inter-City Road No.038 / T / BM / 1997), and rigid affinity planning for planning that needs to be improved in order to improve it based on procedures Pavement Concrete Pavement Road Construction and Building Department of Settlement and Regional Infrastructure (Pd T-14-2003) From the results of the re-planning of this new road it was found that the second phase was the best in terms of technical and cost aspects. The length of the road is 5,400 km with 4 bends full circle. The thickness of the rigid pavement layer is 19 cm. The total cost from land preparation works to rigid pavement works is Rp. 80,078,971,000.00

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed