Analisis Perbandingan Aplikasi Fasad Dinding Pracetak (Precast) Dengan Dinding Kalsiclad 12 Pada Tower Rosewood Proyek Apartemen Darmo Hill Surabaya

The Comparison of Application Between the Precast Wall Facades and The Kalsiclad 12 Wall Facades at The Rosewood Tower on Darmo Hill Apartment Surabaya

DARA OKTARINDA

The construction world must improve the quality of planning with various construction methods. The purposes of this thesis is to compare the most effective materials used between the precast wall façades and the kalsiclad 12 wall façades by analyzing and designing the structure, making the fabrication management of the prefabricated façade, making the metode of implementing and comparing the installation, calculation the duration of the work, calculating construction costs, and planning occupational Health and Safety. The required data work productivity, shopdrawing of the Darmo Hill Apartment Project, the technical specification of the Darmo Hill Apartment Project, and the price of the principal unit of activity on Surabaya 2019. Structural analysis is carried out using staadpro V8i software, the calculation of the duration is obtained from the calculation of the volume divided by work productivity, analysis of work cost is done by entering the unit price data of the work multiplied by the volume of work, work health and safety planning is done by making hazard identification and risk control. From the calculation results obtained the duration of work of kalsiclad 12 façade per floor is 0.5 days faster with a total duration of 11 days compared to the precast façade, the cost of precast façade work is Rp 1,409,540,468 compared to kalsiclad 12 façade, the result of work safety and helath planning that have been made, mostly including work at heights and have a rating of 25 are included in extreme risk.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed