Studi kelayakan teknis dan finansial pada proyek apartemen mahakarya Tangerang Serpong

Technical and Financial feasibility study on apartement project of mahakarya Tangerang Serpong

FANDI ACHMAD DERMAWAN

Apartment Mahakarya Tangerang Serpong located in Jl. Raya Rawa Buntu , RW. Buntu district of Serpong, City of South Tanggerang. This apartment is in that location is the strategies area, with the concept of the residents made easy access to Jakarta, because it’s connected with a Rawa Buntu station located opposite the apartment. They are using the mass transportation of Comuter line, that’s very present in the development process is not considered technical and financial analysis Based on Data Apartments of Tangerang masterpieces required are location plots, drawings, apartment specifications, and project budget plan. Technical feasibility will be reviewed from the parameters of KDB (building base coefficient), KLB (soil coefficient), KDH (green basic coefficient). Financial eligibility will be reviewed from the parameters of NPV (Net Present Value), BCR (Benefit Cost Ratio), IRR (Internal Rate of Return), and PBP (Pay Back Period). The sensitivity analysis is in review of construction and sales cost increases. Technical feasibility result in a KDB value of 75%, rate KLB result of 16.1491 and for the value OF KDH at 15%, it can be concluded for technical analysis is “qualified” category, for financial feasibility of generating NPV as Rp. 9,138,258,911;; BCR of 1.031319; IRR by 7%; The PBP for 17 years and 8 months, and the increase or decrease in the income of the project is sensitive to eligibility, so it can be concluded that the project deserves.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed