Analisis Perbandingan Bekisting Kayu, Baja Hollow, Dan Baja Unp Dari Segi Biaya Dan Waktu Pada Proyek Pembangunan Gedung B Rsud Badung Bali.

The Comparative Analysis of Timber, Hollow Steel, and UNP Profiled Formworks in Terms of Time and Cost on Building B Regional Hospital Project Badung Bali

SANDI MAWARNITA HEMANINGTYAS

Building B Regional Hospital Badung Bali construction used formwork for all stuctures and pedestals. This thesis aims to design an alternative formwork of Hollow steel and UNP steel compared to timber. It is comparative analysis of time and cost on each type of formwork for beam, slab, and column. The required data were of technical specifications, shop drawings, work and material unit price of Badung Bali 2017. The method used in this thesis is by analyzing the material strength of the formwork structures and work sampling method with direct observation in site. The analysis results in the formwork with 4,728.7635m2 for beams; 4,051.1325m2 for slabs; and 2,271.96m2 for columns; 5/7 kaso and 6/12 logs for timber formwork on 117 workdays; 50.50.3 and 40.40.3 for hollow formwork on 109 workdays; and 50.38 for UNP formwork on 101 workdays; the material coefficient observations resulted in Rp.4.512.980.223 for timber; Rp. 4.100.135.344 for hollow; and Rp.4.083.117.303 for UNP. The final result showed that the most efficient formwork was UNP formwork with 14% time efficiency (16 days) and cost efficiency of 9.5% (Rp 429.862.921)).

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed