Analisa Perbandingan Penggunaan Bekisting Sistem dan Bekisting Semi Sistem pada Proyek Pembangunan Apartemen Suncity Sidoarjo

A comparative analysis of the use formwork system and formwork semi system in the suncity apartmen development project

ISNA MAULIDA

Suncity Sidoarjo Apartment is a 30-storey building with 27 residential floors, 1 Basement floor, 1 Ground floor, and 1 Parking floor. The implementation of formwork work is one of the structural work components that requires the greatest cost. To anticipate this, formwork systems that are stronger, easier and can be used many times can be used. The purpose of this study is to analyze the comparison of the use of formwork systems and formwork semi systems for beam and slab works, compile the method of implementation and to compare the use of formwork material using phenolic multiplex material and ordinary multiplex material in terms of time, quality and cost. The required data were of shop drawings of beam and slab works. The material used in the method of bekising system is phenolic multiplex, while the material used in semi-system formwork is ordinary multiplex. The more economical materials of different material was analyzed in term of its implementation, cost referring to material unit price of Surabaya 2019, and time. The analyses result in more economical using method of formwork system with phenolic multiplex material at IDR 78,752,083,063.81, compared to the semi system formwork method with the usual multiplex base material at IDR 93,314,623,269.27; 5 week faster; and more practical setting.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed