Project Planning Proyek Pengembangan Gedung Kampus II Universitas Widya Gama Malang
The Project Planning of Kampus II Building Development Project University of Widyagama Malang
Kampus II Building University of Widyagama Malang is developed from 3floored building in 3,524m2 into 5 floors in 7,352 m2 area. The floor, the wall and the interior of the existing building will be redesigned. This self-managed project aimed to plan the organization structure, the site layout and traffic management, implementation strategy and method; to determine the schedule, quality control, Safety Health and Environment; and to estimate the cost. The required data were of shop drawings, Bill Of Quantity (BOQ), work plan and terms (RKS), work unit price of Malang District 2018. Microsoft Project 2013 and Microsoft Excel 2007 programs were for scheduling and estimating the cost. The project planning resulted in 11 positions in the core of organization structure;one gate system for in and out access in the north ; zoning area strategy and bottom-up implementation method; on 360 calendar days; quality control in line with work plan and terms (RKS); safety net to protect people from injury due to falling materials; at Rp 20,902,933,986.19