Studi Kelayakan Teknis dan Finansial Proyek Pembangunan Perumahan Nilaya Kota Batu
A Technical and Financial Feasibility Studies of Nilaya Housing Development Project Batu
Nilaya Housing development project that will build on an area of 26.73ha requires feasibility study to find out the investment is feasible or infeasible. The purpose of this feasibility studies to find out technical feasibility of applicable regulations, investment cost, financial study, determine a site plan that more feasible and sensitivity analysis. The required data were of basic design, work unit price analysis (AHSP) of PERMEN PU No.28 year 2016, work and material unit price (HSD) of Batu 2017, land cost, and license fee. Technical feasibility study refered to PERMENPERA No.11 year 2008, PERDA Batu No.7 year 2011, and PERWALI Batu No.43 year 2017. The parameters used for financial feasibility study are Payback Period (PP), Net Present Value (NPV), Benefit Cost Ratio (BCR), and Internal Rate of Return (IRR). Sensitivity analysis was based on changes of precentage of capital, construction cost, sales revenue, and loan interest rate. The technical feasibility study resulted the value of feasibility parameters for site plan A is 4 and site plan B is 4.0625, so the site plans are appropriate to the feasibility parameter. The investment cost of site plan A and site plan B are Rp 643,501,520,234.46 and Rp 677,115,409,229.74. The financial feasibility study site plan A resulted in 4.72 years PP; Rp 94,262,212,812.74 NPV; 1.097 BCR; and 50.935% IRR, and site plan B resulted in 4.60 years PP; Rp 100,909,519,895.41 NPV; 1.099 BCR; and 53.522% IRR. From the technical and financial feasibility parameters site B is declared more feasible than site plan A. Sensitivity analysis showed that only the percentage change of capital is not sensitive to NPV, BCR, and IRR.