Perbandingan Desain Pelat Lantai Konvensional Dan Pelat Lantai Bondek Pada Hotel Amaris Bintoro, Surabaya
Comparison Design of Conventional Concrete Slab and Bondek Slab at Amaris Bintoro Hotel, Surabaya
NURIN SHABRINA ZATA LINI HAIDI
Amaris Bintoro Hotel Surabaya is a hotel which has 10 storeys including equipment floor and rooftop. Comparison of instalation conventional concrete slab and bondek slab was needed to determine the efficient design of slab. This thesis aimed at comparing conventional concrete slab and bondek slab in terms of design, implementation methods, cost and time. The data required in this design analysis were: design drawing, technical specifications, and specifications of the bondek slab, the 2016 unit price of work analysis and 2018 unit price of work in Surabaya. The data were used to estimate the cost of conventional concrete slab and bondek slab construction. The calculation of the slab moment was analyzed using STAAD.pro v81 program. The work schedule of slab was arranged, using Microsoft Office Project. From the analysis design result, the thickness of conventional concrete slab was 12 cm and bondek slab was 10 cm. The cost of conventional concrete slab construction was 488,400.00 IDR/m2 in 423 work days. While the total cost of bondek slab construction was 394,100.00 IDR in 295 work days. Based on the calculation results the use of bondek slab is more efficient than conventional concrete slab