Perencanaan Acuan Dan Perancah Pada Proyek Pembangunan Apartement Begawan Malang
Planning of Formwork and Scaffolding in Begawan Apartment Development Project Malang
Planning formwork and scaffolding in the Begawan Malang Apartment project has three alternative options, including conventional, semi-system and system (PERI) methods. This thesis aims to compare three alternative formwork and scaffold work in terms of material strength, time, and cost. Stages in conducting research are: Selection of appropriate method of beam, plate and column implementation, calculation of material strength, cost calculation, so that it can be compared in terms of cost. Calculation of duration can be a comparison of the duration of work time. With the results of the comparison of the beam plate formwork that was been done, in terms of the cost of the semi formwork system method with a deflection of 0.05 <0.17 cm is 3% cheaper than the conventional method and 54% cheaper than the system method (PERI). Whereas in terms of system method time (PERI) 1030 days faster than conventional methods and 100 days faster than the system method (PERI). As for column formwork, in terms of the cost of the steel panel method six times cheaper than the fiberglass method and three times cheaper than the semisystem method. In terms of time, the steel panel method is 170 faster than the fiberglass method and is 90 days faster than the semi-system method.