Studi Kelayakan Teknis dan Perhitungan Biaya Konstruksi Rencana Pembangunan Jembatan Tlogomas-Tunggulwulung Kota Malang

The Technical Feasibility Study and Cost Estimate of Tlogomas-Tunggulwulung Bridge, Malang

FIRMAN MAULANA JA'FAR

The Government of Malang plans to build 60 m Tlogomas –Tunggulwulung bridge. This thesis aims to find out the volume of vehicles passing the bridge within 25 years cycle, to determine the type and the proper bridge design as well as the esimate cost to build Tlogomas – Tunggulwulung bridge. The required data were of vehicle volume of 2018 from site survey, rainfall capacity 2008-2017 from 3 nearest of Dau, Ciliwung and Sukun and work unit price of Malang 2017. Gumbel method was applied to find out the elevation of flood surface;RSNI T-02-2005 was reference of loading proccesed through STAAD Pro v8i application. Load and Resistance Factor Design (LRFD) method was used to determine the materials. The analysis resulted 11,331 pcu/hour in 2043; 8,07 m minimum height of the lower part of the upper bridge structure from the river bed; Reinforcement of slab using 14 and 10 , IWF 620x300 girder for elongate, IWF 921x420 and 1,068x417 for transverse, IWF 438x407 for main structure. At IDR 39,355,055,760

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed