Studi Kelayakan Pembangunan Fly Over di Simpang Jalan Ciliwung Kota Malang.
A Technical Feasibility Study of Fly Over Project on Jalan Ciliwung Malang
Jalan Ciliwung is one of congested road because of unsignalized intersection and railway crossing activities. This thesis aimed to identify the unsignalized intersection performance, to find out the vehicle operating cost, and to make a technical feasibility study of fly-over project. Indonesian Highway Capacity Manual (MKJI) 1997 was the reference of intersection analysis and Pacific Consultan Internasional (PCI) was the reference of of vehicle operating cost . Daily traffic data were obtained from the site surveys carried out on Saturday, 2nd June 2018 and Monday, 4th June 2018 at 06:00 a.m. – 06:00 p.m. The analysis resulted in 0.839 degree of saturation (DS) with level of service (LOS) D; the vehicle operation cost at IDR 5,157.725/vehicle and 13.9 sec./vehicle delay at unsignalized intersection. Applying scenario (moving cars and heavy vehicle to fly-over) resulted in 0.489 DS at LOS A on lower road; 9.00 sec./vehicle delay at unsignalized intersection at estimated project cost IDR Rp 21,931,353,484 meaning that the fly-over is technically feasible.