Perencanaan Bekisting dan Perancah pada Proyek Pembangunan Gedung Rumah Sakit Universitas Hang Tuah Surabaya

Formwork and Scaffolding of Hang Tuah University Hospital Surabaya

ROSA AMATUL MEIDINA

The six-floor Hang Tuah University Hospital Suarabaya Building has a total area of 1,128 m2 it was erected in 2017. The purpose of this thesis was to plan the work efficiency of multiplex meterial formwork and scaffolding tools in the building. To plan the implementation method, implementation cost and work health. The data used in this planning included shop drawings, as well as Surabaya City work unit prices in 2017. Implementation was planned to use a kaso / scaffolding material SNI-03-0691-1996, for calculation of implementation costs using Microsoft Excel application calculations while, for scheduling calculations using Microsoft Project 2007. The method used to erect formwork is semi conventional which costs Rp 710.433.875 in total from floors 5 and 6 . The time needed in semi conventional was 75 days for the work of column formwork, beams and plates and the number of workers for formwork work was 404. Based on the analysis of the workload and formwork is more efficient, careful and economical.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed