Project Planning Proyek Pembangunan Gedung Apartemen Begawan PT. PP Properti Kota Malang
The Project Planning Of Begawan Apartment Construction Project PT. PP Properti Malang
The 39,464-m2 Begawan Apartment construction project of PT. PP Property Malang is on the area of 10,787 m2. This high rise apartment comprising 20 floors and 2-floored basement located in the middle of the town. Consequently,it is rather difficult to mobilize the tools and materials. The purpose of this thesis is to make an alternative project planning in terms of traffic management, site layout, implementation method, quality; safety, health, and environment; cost, and scheduling. The required data were of shop drawings, work plans and terms, and work unit price (HSPK) of Malang 2017. Occupational Health Safety Study refered to Minister Rules of No. 4 Year 1987 and OHSAS 18001:2007. The planning resulted in 3 alternative site layouts: the first using 2 Tower Cranes, 3 Passenger Hoists, and 3 Halimax; the second using 1 Tower Crane, 3 Passenger Hoists, and 3 Halimax; the third using 2 Tower Cranes and 2 Passenger Hoists; 3 alternative Traffic Managements: the first use when materials come from Surabaya, the second and the third uses when materials come from Malang; the implementation method using top-down as alternative 1 and bottom-up as alternative 2 and 3; Standard Operating Procedure and Quality Target made for the implementation quality plan; safety plan, HSE (Health, Safety, and Environment) structural organization, HSE equipment plan, and HSE schedules made for HSE implementation; the existing bottom-up method at IDR.657,953,845,075 on 750 calendar days; the reviewed top-down method at IDR.737,203,065,843 on 693 calendar days, and the made bottom-up method at IDR 534,974,570,850 on 980 calendar days.