ACHMAD RIZKI HIDAYATULLAH

The electric power of Politeknik Negeri Malang (Polinema) is supplied from PLN but it has not met the needs. For this reason, a power plant is needed by empowering water from the Brantas River to the south of Polinema. It is necessary to plan the dam to be used as a Micro Hydro Power Plant including 50year cycle flood discharge, weir construction dimension, discharge of intake structure, the value of stability control, and the cost estimate. The required data were of rainfall from 3 nearest rain stations: Dau, Karangploso and UB 2007 - 2016, topographic map, soil, and Work Unit Price (HSPK) of Malang 2017. Manning and Gumbel analysis method was the reference of planned flood discharge. The planning resulted in 16.857m2/sec. planned flood discharge; 2m tall and 12.5m wide crest dimensions; 2m long sink bucket; 9m long upstream floor; 2m tall and 1.5m wide intake structure dimensions; 2m tall and 1.5m wide intake gate dimensions; stability control seen from 2 conditions—normal water conditions: 2.112 due to rolling;1.723 due to shear; 0.570m due to eccentricity; 0.706ton/m2 due to maximum bearing capacity; 0.119ton/m2 due to minimum bearing capacity; flood water conditions: 1.857 due to rolling; 1.592 due to shear; 0.765m due to eccentricity; 1.830ton/m2 due to maximum bearing capacity; 0.009ton/m2 due to minimum bearing capacity, at IDR.1,874,748,000. All control stability values are safe for rolling, shear, eccentricity, bearing capacity, and underground erosion.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed