Studi Perencanaan Abutment Dan Pilar Jembatan Sungai Widas Nganjuk

The Design Of Abutment And Pier Of Widas Nganjuk Bridge

AKBARRANI ARIPRATIWI

One part of Solo – Kertosono Toll Road Project is the construction of ± 120m Widas Bridge, located in Nganjuk section STA 0 + 338.473 – STA 153 + 644.802. According to the design this bridge has 2 abutments and 2 piers having varying heights to support the structure of this bridge. The purpose of this thesis is to find out the loading of upper structure of abutment and pier of Widas Bridge, to design the abutment and pier, to design the foundation, and to determine the implementation method of the 50-m span bridge girder. Loading referred to SNI rules bridge 2016 and AutoCAD 2012 was for shop drawings result. The result of N – SPT ( Standard Penetration Test) method was applied to find out the depth of hard soil. The method of implementing the erection girder was determined based on site conditions. In this project, the implementation of the girder erection used the launcher method. The design resulted in 113.607,5643 kN the loading of Abutment 1 (A1) right; 6.080.673,67kN the loading of Pier Ramp 2 (PR2); 8D 28mm/m tensile reinforcement of abutment breast wall; D 20-100mm/m shrinkage reinforcement abutment footing; pier wall using 9D 32mm/m tensile reinforcement, footing using D 20-100mm/m shrinkage reinforcement; ø0.6m foundation of 27.5m deep abutments and piers; 113.852,22kN bearing capacity; ø60cm Abutment 1 (A1) right, 65 circular posts, 27,5m deep; 63.265,55kN bearing capacity of Pier Ramp 2 (PR2), 36 circular posts, 27,5m deep; 127,80mm settlement of abutment; 137,00mm settlement of pier; for 7 days using launcher.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed