Perencanaan Alternatif Geometrik, Perkerasan Lentur dan Metode Pelaksanaan Jalan Lingkar Luar Barat Surabaya STA 4+850 - STA 11+500
An Alternative Design of Geometric, Flexible Pavement, and Implementation Method of the West Outer Ring Road Surabaya STA 4+850 - STA 11+500
6.65-km the west outer ring road project located in Surabaya City is aimed to reduce the congestion of the downtown Jl. A.Yani. The purpose of this thesis is to alternate the design of the road geometrics, to determine the depth of flexible pavement as well as its implementation methods, and to estimate the cost. The required secondary data were of topographic maps, technical data, and soil data obtained from Public Works office of Bina Marga and Pematusan Surabaya, traffic data from Transportation Department of Surabaya, which were converted into the percentage of vehicles growth to obtain LHR (daily traffic) data of 20 years. The Procedures of Geometric Planning of Inter City Roads 1997, Component Analysis Method 1987 and work unit price of PU (Public Works) Bina Marga were the references. The design resulted in 10.5m wide, 2.5m shoulder, artery of 120km/h; 5 curves of Spiral-Circle-Spiral from horizontally alignment and 4 curves of parabola from vertical alignment: 2 convexes and 2 concaves; 61cm deep flexible pavement consisting of 31cm sub base course, 20cm base course layer, 10cm surface layer; flexible pavement method consisting of a subbase work, base work, prime coat work, and surface layer; at IDR.464,468,466,000,-.