Identifikasi Faktor Penyebab Terjadinya Pembengkakan Biaya (Cost Overruns) Pada Proyek Jalan Tol
The Identification of Factors Causing Cost Overruns on Toll Road Construction Projects
Toll road construction projects have many risks which may result in cost overruns. The purpose of this study was to identify the factors causing cost overruns, the effect of the factors causing cost overruns, and to determine some solutions to minimize the factors causing cost overruns on toll road PandaanMalang, Gempol-Pasuruan, and Pasuruan-Probolinggo projects. This is a library research reviewing some previous researches relevant to the purposes of the research, 11 questionnaires to contractors and 3 academics. SPSS statistics and Ms. Excel were applied to process the questionnaires data. The research resulted in 22 factors causing cost overruns classified into five groups: unpredictable external, predictable external, legal, technical, and internal non-technical; natural disaster resulting in damage as the dominant factor causing cost overruns, frequent delays due to the work of site conditions, accidents due to lack of awareness of K3 (SHE), frequent design changes in site due to improper previous design, and rise in material prices; generated several solutions to minimize the dominant factors: the standardized construction, technical feasibility studies, implementing K3 regulations, accurate planning, and adding the cost of risk into the bidding.