Perencanaan Perawatan Turbin Uap Kapasitas 200MW Tipe Tcdf Periode 2019 S.D. 2021

The Maintenance Planning of Steam Turbine with Capacity of 200MW type of TCDF in the period of 2019 - 2022

JAKA NOVIANTO

The steam turbine is one of the most usable engines utility in the power plant. The function of this steam turbine is to convert heat energy into mechanical energy to drive the generator. This steam turbine operates during 24 hours perday,so it is easy to damage and problems in its components. Therefore, proper maintenance planing is required. The purpose of the maintenance planning using preventive method is to keep the turbine performance optimum it can reduce the breakdown number. The preventive maintenance method aims at preventing and reducing the occurrence of damage to steam turbines by dividing maintenance activities into monthly and annual or overhaul. The result of this maintenance planning is the periodic maintenance schedule and cost estimation during the period 2019 - 2022 and it costces Rp 423.398.494, -

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed