Perencanaan Ulang Pondasi Sky Bridge Revo Town Bekasi
The Foundation Redesign Of Sky Bridge Revo Town Bekasi
Sky Bridge Revo Town has a span of 63 m across the Jakarta-Cikampek toll road, and using a deep foundation. The writer redesigned the bored pile with a pile foundation with “hydraulic jack in” method. The purpose of this final project was to know the steps in designing pile foundation and can do the calculation steps of the pile foundation with the “hydraulic jack in” method. The purpose of this writing is to understand the calculation of structure loading, understand steps of calculation of the pile foundation and can calculate correctly, and understand the pile driving with “hydraulic jack in” method. The data needed were working drawings, bore log, soil consolidation, the method of implementing the pile foundation. The method of calculating bearing capacity and settlement was based on SPT that presented in bore log form. The loading calculation method used the "SNI 1727 : 2020 Beban desain minimum dan kriteria terkait untuk bangunan gedung dan struktur lain.” The combination load of the structure (Qv) for T4 is (3363,115 kN) and T5 is (3354,531 kN). The redesign resulted in the bearing capacity of the pile group on T4, and T5 are (59917,329 kN) and (17201,842 kN). The bearing capacity of group piles meet the requirement of allowable load (Qall) where T4 (19972,443 kN>3363,115 kN) and T5 (5733,947 kN>3354,531 kN). The settlement that occurred in T4, and T5 are (15,916 cm) and (2,005 cm) and meet the requirement of allowable settlement where T4 (15,916<16 cm) and T5 (2,005 cm<16cm) .And the method of “Hydraulic jack in” implementation, in accordance with what was said in the discussion.