Perencanaan Ulang Saluran Drainase pada Jalan Akses Bandara Kediri

The Alternative Design of Drainage Channel on the Kediri Airport Access Road

KRISNA CAHYA PRADANA

Kediri airport is located at Tarokan Kabupaten kediri. This airport have 3090 meters access road. Every road need a good drainage system to prevent flooding. Current drainage system in this road is inadequate due to it's small canal dimensions and sedimentation at the bottom, which is resulted in flood especially during thr rainy season. Doing redesign could solve this problem. The purpose of this study is to replan the channel so that there is no inundation due to excessive rainfall. The data used are primary data obtained directly in the field such as existing channel data and secondary data such as site plan data, topographic maps, rainfall data, and HSPK of Kab Kediri. Data processing methods are carried out from the consistency test, regional rainfall analysis with t algebraic average method, rainfall analysis design of the Gumbel method, test the suitability of distribution with the Smirnov-Kolmogorov and Chi-Square methods, calculation of runoff discharge, calculation of waste discharge, calculation of cumulative discharge until calculation of channel dimensions. Based on the calculation results obtained by design rainfall with a 5-year return period of 105,531 mm /day and a total design discharge of 2,406 m3 / sec so that a rectangular channel section with width (b) = 0,75 m and height (h) = 1 m. It is planned that the dimensions of the control tub at 1 x 1 x 1,2 m, 1,2 x 1,2 x 1,2 m, etc. with a total of 2 units. Estimated cost in this re-planning was obtained value Rp. 6,708,712,763,-

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed