Perencanaan Ulang Struktur Atas Hotel Borneo Tarakan Kalimantan Timur
The Redesign of Upper Structure Hotel Building Tarakan East Kalimantan
Borneo Tarakan Hotel North Borneo consists of three main floors and a roof-top floor with a total building area of 970 m2. The construction of this Hotel using a concrete structure and the distance between the columns along the 4 meters is feared to result in dimensions of the columns that are too large (60cm x 60cm). It also affects the larger cost, so the authors re-plan the distance between the original columns 8 meters to 4 meters to produce smaller column dimensions (50cm x 50cm) and to produce a smaller cost. As for concrete structure, used concrete quality fc '= 30 Mpa, steel quality fy = 400 Mpa and 240 MPa. The purpose of this final report is to plan the structure of the earthquake-resistant concrete and structural cost budget. Planning data obtained from PT. Aprilia in December 2016, then replanned by the author using the method of calculating the concrete structure refers to SNI-03-2847-2013. To analyze the calculation of inner forces that occurred in the concrete and steel structure used computer analysis program STAAD.Pro V8i 2007. and for the depiction of the results of analysis using computer program AutoCad 2013. The redesign results are : Floor plates with a thickness of 120 mm using the main reinforcement 13-250 mm and reinforcement for 10-200 mm. 25/45 cm beams on 4-D12 mm and below 3-D12 mm on the lower ground 4-D12 and above 2-D12 mm with shear reinforcement 10. The 40/60 cm main beam on the top 5-D22 mm and below 4-D22 mm, on the lower field of 4-D22 mm and above 2-D22 mm with Ø10 shear reinforcement. The 50/50 cm column uses the main reinforcement D22 with a diameter of 10 for the crosslink. The main reinforcement stairs are D22 mm, the reinforcement diameter 10. The calculation of the cost budget for the structure is Rp7.803.321.000,00