Perencanaan dan Analisa Sistem Monitoring Debit Air dan Output Generator pada Pembangkit Listrik Picohydro di Coban Tarzan Kab.Malang Jawa Timur
Planning and Analysis of the Water Flow Monitoring System and Generator Output at the Picohydro Power Plant in Coban Tarzan, Malang Regency, East Java
The increase in human resources and the potential for electricity generation in remote areas, especially the potential for abundant water, opens up opportunities for the development of small scale power plants called picohydro power plants (PLTPH) as renewable energy sources (Renewable Energy). In the PLTPH power plant suitable for areas far from the PLN distribution channel. In the PLTPH system monitoring of water flow and generator output is required. In picohydro power plants, flow meters are used to see the speed of water flow in a pipe that is attached. Water flow through the flow meter sensor will be read then sent and will be displayed on an LCD flow meter screen, the results displayed are LCD flow meters depending on the flow of water. In the monitoring system that is designed to produce water flow of 0,035 m3 /s and when testing open circuit generators in the laboratory produces an output rotation of 905 Rpm and a voltage of 21 V then when testing a short circuit generator produces an output rotation of 500 Rpm and current (Isc) 1,77 A then when testing with a 25 watt lamp load produces a rotation of 704 Rpm, a current of 1,54 A and a voltage of 7,2 V.