Implementasi Tubrin Crossflow pada Sistem Pembangkit Listrik Tenaga Piko Hidro di Balai Konservasi Lutung Javan Langur Center kota Batu

An Implementation of A Crossflow Water Turbine for Pico Hydro Power Plant System at Langur Conservation Center Batu

RIKHI ZAKFAR

The Javan Langur Center (JLC) is a langur conservation site in Java that focuses on conservation and animal protection efforts. In order to maintain the preservation of the surrounding environment and the original atmosphere of the forest, to meet JLC's electricity needs, the electricity supply of the heating around Coban Talun is located 1 km away. Considering that the water potential possessed by the JLC is very suitable for generating renewable energy, namely the Pico hydro Power Plant. This type of turbine is one of the important factors in creating an effective power plant. Thus, the researchers implemented a cross-flow turbine as a turbine type that has an efficiency level of up to 84%. This study aims to analyze the design of the turbine, the level of efficiency and the speed of rotation. This research begins with the 2D design and applied in real shape. Data collection is done by doing the workflow of the entire process with the analysis method, using a comparison of test data and measurements in the field. After calculating and analyzing a simple turbine design with a trapezoidal blade easy to disassemble, the highest efficiency value is 65.837% and the speed is 70.3 rpm when the conditions are non-rotating and 37.529% and the speed is 57.6 rpm when the condition is increased.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed