Kajian Audit Energi dan Kelistrikan Gedung Graha Politeknik Negeri Malang

A Case Study of Energy Audits and Electrical Gedung Graha Politeknik Negeri Malang

GAYUH SATRIA

This building continues to update until now. Along with building renewal, the use of electricity is increasing every year. The installed power in the Graha State Polytechnic of Malang is 1000 kVA from PLN with the S-3 tariff of group for power above 200 kVA and is supplied with a back up of 550 kVA power capacity generators. Energy audits are carried out so that energy use in the building becomes efficient. The energy audit in the Graha State Polytechnic of Malang building is focused on lighting systems, cooling systems, elevators, and centrifugal water pump motors. From the results of the study, the overall energy use in the Graha State Polytechnic of Malang building was 264970.26 kWh and the index consumption energy was 75.1591 kWh / m2 / year. This value is classified as efficient where the standard of a Commercial / Educational building is 240 kWh / m2 / Year. Determination of the level of lighting carried out with the DIALux simulation for example lab instrument 1 in the basement. The average lighting is 213 lux. In the electricity distribution system, maintenance needs to be carried out regularly so that it does not cause damage or undesirable things. To find out the condition of the equipment carried out an observation of the temperature of the equipment using a thermal imager.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.28.2 · c6ad4ed