Analisa Pengaruh Pembebanan Terhadap Load Sharing Pada Generator TG-65 & TG-66 Di Pabrik IIIA PT. Petrokimia Gresikk

Analisys Of Effect Againts Imposition Load Sharing In Generator TG-65 & TG-66 In Plant IIIA PT.Petrokimia Gresik

MANSYUR FAHMI

It has 6 units Generator and supply PLN capable of providing electrical energy at each mill, the factory 3A itself is only supplied by a generator TG-65 and TG-66 who did not participate interconnection with petro highway due to setting governor TG-66 is isochronous whereas the interconnection system that acts as isochronous is PLN which, if imposed interconnects the two supply will be fought to the frequency setting on the system. At the factory 3A also frequent load fluctuations when the plant is operating, when there are fluctuations in the generator TG-65 and TG-66 must coordinate to cope with fluctuations in the load and in the event of the release of a very large burden then need to perform load sharing on both the generator in order second p cos generator balanced. In November - December 2017 in the factory 3A has done the repair process unit generator TG-65 and TG-66. In these circumstances the second unit will be separated synchronous generator so that all the burden will be borne by the TG-65 is synchronized with PLN. Then TG-65 off in sync with the PLN, then all load Factory III A will switch the supply to PLN. In this thesis analyzed the effect of loading on the load sharing governor setting on the TG-65 and TG-66 that uses simulation software ETAP 12.6, through the simulation is shown working generator TG-65 and TG-66 when there are fluctuations in the load, and the release unit TG- 66 as isochronous and the current process load transfer to PLN. In these circumstances the second unit will be separated synchronous generator so that all the burden will be borne by the TG-65 is synchronized with PLN. Then TG-65 off in sync with the PLN, then all load Factory III A will switch the supply to PLN. In this thesis analyzed the effect of loading on the load sharing governor setting on the TG-65 and TG-66 that uses simulation software ETAP 12.6, through the simulation is shown working generator TG-65 and TG-66 when there are fluctuations in the load, and the release unit TG- 66 as isochronous and the current process load transfer to PLN. In these circumstances the second unit will be separated synchronous generator so that all the burden will be borne by the TG-65 is synchronized with PLN. Then TG-65 off in sync with the PLN, then all load Factory III A will switch the supply to PLN. In this thesis analyzed the effect of loading on the load sharing governor setting on the TG-65 and TG-66 that uses simulation software ETAP 12.6, through the simulation is shown working generator TG-65 and TG-66 when there are fluctuations in the load, and the release unit TG- 66 as isochronous and the current process load transfer to PLN. In this simulation generated a response from a generator that has a setting speedroop and isochronous load fluctuations occur when there are not so large oscillation is about ± 0.2% Hz from the nominal frequency, but these oscillations continues over time, the magnitude of these oscillations is still according to standard SNI 04-1922-2002 and IEC 60 196(1965-01) is the maximum oscillation of ± 1% of Hz Nominal Hz. At the time of TG-66 termination unit oscillation v frequency on bus HVS-65 fell drastically in 4-11 seconds for unit TG-65 is not able to accommodate the entire load and load to be carried sheeding and during the process of transfer of load oscillations that occur at ± 4% and the need to do settings setting on the governor. At the time of load sharing and tested with the release conditions of load unit results obtained are frequency and voltage in the system is much more stable and more effesien.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.26.1 · de96334