Kajian Sistem Proteksi Gardu Induk Bulukandang Berdasarkan RUPTL 2017-2026

Studi Of Protection System In Bulukandang Substation Based On RUPTL 2017-2026

NISAU QURROTI A'YUN MAHSUNI

Distribution of electrical energy plays an important role in the economic growth of a country. Therefore, the distribution of electrical energy from the state electricity company must not be interrupted for 24 hours. PT PLN (Persero) is required to be able to meet the needs of consumers continuously. In a smaller scope, the Substation is required to operate reliably. Bulukandang substation is one of the important substations for the city of Pasuruan where annual electricity consumption growth continues to increase. With the work plan from PLN, the need for long-term load requirements is 2017-2026, in order to find out whether the protection system in the Bulukandang substation is still feasible and works well in securing the system. Based on the analysis of load forecasting calculations at Bulukandang substation where in 2026 the load conditions on transformer 1 were 68% loading and thus with transformer 2 was 62% loading. While the equipment and relays installed at the Bulukandang substation are compared to the results of calculations until 2026, all are still in a safe status, ie not exceeding the installed capacity limit. The protection equipment and relays discussed are CT, CB, DS, OCR, SBEF, REF, Differential where all the equipment and relays are the settings between calculations and installed are not much different.

© 2026 UPA Perpustakaan POLINEMAStatus LayananKebijakan PrivasiSyarat & Ketentuan

v2026.11.26.3 · cdb8caa